Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19RW04372
Permit Details
Apply Date:
08/08/2019
Applicant:
PLUMB PLUMBING, LLC
Description:
REPLACEMENT OF APPROXIMATELY 30 FT OF 6" SEWER WITH NEW 6" DUCTILE IRON PIPE ROAD CLOSURE OF S GREENWAY DRIVE AT IRVINGTON ROAD
Contractors:
- PLUMB PLUMBING, LLC *APA*
- PRO TRENCHING L L C
Completed Inspections
Permit Status: Final
Permit Number: T19RW04372
Permit Description: REPLACEMENT OF APPROXIMATELY 30 FT OF 6" SEWER WITH NEW 6" DUCTILE IRON PIPE
ROAD CLOSURE OF S GREENWAY DRIVE AT IRVINGTON ROAD
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2019 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | underground work complete and asphalt patch was installed 25x4, was waiting on concrete restoration. Sidewalk was finally reinstalled. No more isses |