Permit: T19RW04136
Permit Details
Apply Date:
07/25/2019
Applicant:
THE ZAYO GROUP
Description:
UNDERGROUND/AERIAL CONSTRUCTION TO INSTALL FIBER OPTIC CABLE (MELLOW CAT 2)
Contractors:
- ENE CONSTRUCTION LLC
- MEARS GROUP INC *** APA ***
Completed Inspections
Permit Status: Final
Permit Number: T19RW04136
Permit Description: UNDERGROUND/AERIAL CONSTRUCTION TO INSTALL FIBER OPTIC CABLE (MELLOW CAT 2)
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/23/2020 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Zayo fiber installation by Mears Group. Final. |