Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
07/23/2019
Applicant:
THE ZAYO GROUP
Description:
UNDERGROUND/AERIAL CONSTRUCTION TO INSTALL FIBER OPTIC CABLE (MELLOW CAT 5)
Contractors:
  • ENE CONSTRUCTION LLC
  • MEARS GROUP INC *** APA ***

Completed Inspections

Permit Status: Final
Permit Number: T19RW04077
Permit Description: UNDERGROUND/AERIAL CONSTRUCTION TO INSTALL FIBER OPTIC CABLE (MELLOW CAT 5)
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/25/2019 TDOT-EXCAV GENERAL INSPECTION DR Approved Install complete. Sunland completing mill and fill under other permit. New permit will be required for full depth patch.

Documents

File Name Document Type  
T19RW04077.PDF ROW-RIGHT OF WAY VIEW
T19RW04077 R1.PDF ROW-RIGHT OF WAY VIEW