Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19RW04020
Permit Details
Apply Date:
07/19/2019
Applicant:
THE ZAYO GROUP
Description:
UNDERGROUND/AERIAL CONSTRUCTION TO INSTALL FIBER OPTIC CABLE (WILDCAT 7) NOTES: A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season. MESSAGE BOARDS MUST BE USED INAPPROPRIATE SPOTS TO INFORM ON COMING TRAFFIC OF THE DURATION 3 DAYS BEFORE WORK BEGINS. SURROUNDING BUSINESSES MUST BE NOTIFIED OF WORK. BUSINESS ACCESS MUST BE MAINTAINED AND SIGNED. SCHOOLS AFFECTED BY WORK MUST BE NOTIFIED ABOUT THE DURATION AND LOCATION OF WORK. ( Which includes but does not limit; The University of Arizona, Roskruge Bilingual Magnet K-8 School, Tucson High Magnet School, and Mansfeld Middle Magnet School) CONTRACTOR IS RESPONSIBLE TO ENSURE THERE ARE NO CONFLICTS WITH EVENTS HELD FOR THE UNIVERSITY OF ARIZONA IN THE AREA AT THE TIME OF WORK. TUCSON CITY COUNCIL WARD 6 MUST BE NOTIFIED OF ALL WORK AND DURATIONS FOR THIS PROJECT. YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 ***This street is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.***
Contractors:
- DIVERSIFIED SOLUTIONS OF ARIZONA INC (FN)
- QUAIL CONSTRUCTION LLC
Completed Inspections
Permit Status: Final
Permit Number: T19RW04020
Permit Description: UNDERGROUND/AERIAL CONSTRUCTION TO INSTALL FIBER OPTIC CABLE (WILDCAT 7)
NOTES:
A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season.
MESSAGE BOARDS MUST BE USED INAPPROPRIATE SPOTS TO INFORM ON COMING TRAFFIC OF THE DURATION 3 DAYS BEFORE WORK BEGINS.
SURROUNDING BUSINESSES MUST BE NOTIFIED OF WORK. BUSINESS ACCESS MUST BE MAINTAINED AND SIGNED.
SCHOOLS AFFECTED BY WORK MUST BE NOTIFIED ABOUT THE DURATION AND LOCATION OF WORK. ( Which includes but does not limit; The University of Arizona, Roskruge Bilingual Magnet K-8 School, Tucson High Magnet School, and Mansfeld Middle Magnet School)
CONTRACTOR IS RESPONSIBLE TO ENSURE THERE ARE NO CONFLICTS WITH EVENTS HELD FOR THE UNIVERSITY OF ARIZONA IN THE AREA AT THE TIME OF WORK.
TUCSON CITY COUNCIL WARD 6 MUST BE NOTIFIED OF ALL WORK AND DURATIONS FOR THIS PROJECT.
YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK
SUN TRAN CONTACTS: BEA PAULUS 520-206-8826
CHRISTINA ROCK 520-206-8934
***This street is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.***
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/17/2020 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Work complete. Final. |