Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
535 E 16TH ST
Apply Date:
06/18/2019
Applicant:
COX COMMUNICATIONS
Description:
Continuing from out of row (535 E 16th St ) 35' overlash to TEP pole, riser down and begin 171' bore/ trench heading NE, place 3x3 pothole and place new COX vault, continue 66' bore/trench heading SE and place 3x3 pothole and new COX vault, tie in .
Contractors:
  • MEARS GROUP INC
  • TRUENET COMMUNICATIONS CORP

Outstanding Inspections

Permit Status: Final
Permit Number: T19RW03491
Permite Description: Continuing from out of row (535 E 16th St ) 35' overlash to TEP pole, riser down and begin 171' bore/ trench heading NE, place 3x3 pothole and place new COX vault, continue 66' bore/trench heading SE and place 3x3 pothole and new COX vault, tie in .
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
FIRE INSP - OPERATIONAL PERMIT N/A Not Inspected

Completed Inspections

Permit Status: Final
Permit Number: T19RW03491
Permit Description: Continuing from out of row (535 E 16th St ) 35' overlash to TEP pole, riser down and begin 171' bore/ trench heading NE, place 3x3 pothole and place new COX vault, continue 66' bore/trench heading SE and place 3x3 pothole and new COX vault, tie in .
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/25/2019 TDOT-EXCAV GENERAL INSPECTION Bravin/Meist Approved overlash and boring and trenching all competed, area looked clean and had no issues or repairs needed.
01/31/2020 FIRE INSP - CONSTRUCTION PERMI Bravin Approved ABC---new vault on Toole, no issues with boring or overlash. Permit complete

Documents

File Name Document Type  
T19RW03491.PDF ROW-RIGHT OF WAY VIEW