Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade Only
Apply Date:
04/25/2019
Applicant:
N/A
Description:
TEP will be installing a new overhead capacitor on an existing pole located on the north side of Broadway, 1 span east of Wilmot. There will be no excavation or impact to the joint use attachments.

Completed Inspections

Permit Status: Final
Permit Number: T19RW02308
Permit Description: TEP will be installing a new overhead capacitor on an existing pole located on the north side of Broadway, 1 span east of Wilmot. There will be no excavation or impact to the joint use attachments.
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/10/2019 TDOT-EXCAV GENERAL INSPECTION MVV Approved Appears completed.

Documents

File Name Document Type  
T19RW02308.PDF ROW-RIGHT OF WAY VIEW