Permit: T19RW02304
Permit Details
Apply Date:
04/25/2019
Applicant:
COX COMMUNICATIONS**B
Description:
Starting at TEP pole on the West side of S. Park Ave, North of I-10, riser down pole, trench / bore north 60',Placing a 3x3x3 pothole and New Vault , continue East 100' placing 3x3x3 pothole for New Vault, continue from Vault both East 20' to out of row and North 100' placing a 3x3x3 pothole and New Vault.
Contractors:
- MEARS GROUP INC
- TRUENET COMMUNICATIONS CORP
Completed Inspections
Permit Status: Final
Permit Number: T19RW02304
Permit Description: Starting at TEP pole on the West side of S. Park Ave, North of I-10, riser down pole, trench / bore north 60',Placing a 3x3x3 pothole and New Vault , continue East 100' placing 3x3x3 pothole for New Vault, continue from Vault both East 20' to out of row and North 100' placing a 3x3x3 pothole and New Vault.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2019 | TDOT-Routine Barricade Inspect | Bravin | Approved | 3x3 vault added to east and west side of Park ave. Landscape repaired. No issues with bore as a small pothole on median and a new riser and small excavation on West side of park. Corbitt Farren did complain that the bike path was blocked during construction. Ripley was notified and debri and equipment was removed. No issues |