Permit: T19RW01798
Permit Details
Apply Date:
04/03/2019
Applicant:
COX COMMUNICATIONS**B
Description:
Starting at TEP pole on the East side of El Rio Dr going South overlash 1550' of Fiber to End TEP pole
Contractors:
- CABLE HAWK COMMUNICATIONS L L C
- TRUENET COMMUNICATIONS CORP
Completed Inspections
Permit Status: Final
Permit Number: T19RW01798
Permit Description: Starting at TEP pole on the East side of El Rio Dr going South overlash 1550' of Fiber to End TEP pole
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2019 | TDOT-Routine Barricade Inspect | DR | Approved | Aerial line install. Final. |