Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19RW01639
Permit Details
Apply Date:
03/26/2019
Applicant:
COX COMMUNICATIONS**B
Description:
Start Point: From the TEP pole on the West Side of 1150 E 8th St, begin 1116' overlash heading North , continue 735' overlash heading East, riser down and begin 30' trench bore heading East. Continue 230' bore/trench heading North. place 3x3 pothole and continue 35' trench/ bore heading West . Continue South 25' trench/bore placing new COX vault. head West 20' trench/bore to vault, tie in
Contractors:
- MEARS GROUP INC
Completed Inspections
Permit Status: Final
Permit Number: T19RW01639
Permit Description: Start Point: From the TEP pole on the West Side of 1150 E 8th St, begin 1116' overlash heading North , continue 735' overlash heading East, riser down and begin 30' trench bore heading East. Continue 230' bore/trench heading North. place 3x3 pothole and continue 35' trench/ bore heading West . Continue South 25' trench/bore placing new COX vault. head West 20' trench/bore to vault, tie in
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2019 | TDOT-Routine Barricade Inspect | DR | Approved | Final. No Issues. |