Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
03/15/2019
Applicant:
B & F CONTRACTING
Description:
B&F will be Install 2 12'' HDPE sewer Bypass lines under Freeway Industrial Loop as indicated on the site plan. Tho Total LF of discharge including outside COT ROW is 2000 LF Total LF in COT ROW is 80 LF of which 40 LF will disturb the ROW.
Contractors:
  • HOFFMAN PRO PIPE

Completed Inspections

Permit Status: Final
Permit Number: T19RW01397
Permit Description: B&F will be Install 2 12'' HDPE sewer Bypass lines under Freeway Industrial Loop as indicated on the site plan. Tho Total LF of discharge including outside COT ROW is 2000 LF Total LF in COT ROW is 80 LF of which 40 LF will disturb the ROW.
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/25/2019 TDOT-EXCAV GENERAL INSPECTION DR Approved Final. No Issues.

Documents

File Name Document Type  
T19RW01397.PDF ROW-RIGHT OF WAY VIEW