Permit: T19RW01188
Permit Details
Apply Date:
03/06/2019
Applicant:
COX COMMUNICATIONS
Description:
STARTING ON THE S/W CORNER OF NORTH BENAN VENTURE DR AND WEST SWEETWATER DR AT TEP POLE, OVERLASH TO EXISTING GOING EAST FOR 140' THEN NORTH 55' TO OUT OF ROW. 3/18/19 WORK DESCRIPTION CHANGE: Starting on the S/W corner of N. Benan Venture Dr and W. Sweet water Dr. at TEP pole, Riser down pole placing a 3x3x3 pothole , trench/bore going North for 60' then East 130' placing another 3x3x3 pothole, continue North 20' out of row
Contractors:
- BEAR COMMUNICATIONS OF NEW MEXICO INC
Completed Inspections
Permit Status: Final
Permit Number: T19RW01188
Permit Description: STARTING ON THE S/W CORNER OF NORTH BENAN VENTURE DR AND WEST SWEETWATER DR AT TEP POLE, OVERLASH TO EXISTING GOING EAST FOR 140' THEN NORTH 55' TO OUT OF ROW.
3/18/19 WORK DESCRIPTION CHANGE:
Starting on the S/W corner of N. Benan Venture Dr and W. Sweet water Dr. at TEP pole, Riser down pole placing a 3x3x3 pothole , trench/bore going North for 60' then East 130' placing another 3x3x3 pothole, continue North 20' out of row
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/28/2019 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Final. No Issues. |