Permit: T19RW00930
Permit Details
Apply Date:
02/20/2019
Applicant:
CONFORMATECH INC
Description:
Advance four 8-inch diameter vertical soil boring through pavement near center of 13th Avenue. Project is for geotechnical engineering purposes for proposed new TARP Well R127A Transmission Main. COT CIP 081 710 W539 498 W539
Contractors:
- SOUTHLANDS ENGINEERING LLC
- TUCSON ASPHALT CONTRACTOR*C
Completed Inspections
Permit Status: Final
Permit Number: T19RW00930
Permit Description: Advance four 8-inch diameter vertical soil boring through pavement near center of 13th Avenue. Project is for geotechnical engineering purposes for proposed new TARP Well R127A Transmission Main.
COT CIP 081 710 W539 498 W539
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2019 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | Coring complete, no issues coring was for geo tech info |