Permit: T19RW00916
Permit Details
Apply Date:
02/19/2019
Applicant:
WOOD ENVIRONMENT & INFRASTRUCTURE
Description:
We are blocking one lane of Golf Links Rd for 7 days, which will be the first 4 days of our project (February 27-March 1, and 4) and at the end of the project for 3 days (TBD). This blockage is to allow large vehicles a proper and safe exit out of the project area without causing interruptions of traffic.
Completed Inspections
Permit Status: Final
Permit Number: T19RW00916
Permit Description: We are blocking one lane of Golf Links Rd for 7 days, which will be the first 4 days of our project (February 27-March 1, and 4) and at the end of the project for 3 days (TBD). This blockage is to allow large vehicles a proper and safe exit out of the project area without causing interruptions of traffic.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2019 | TDOT-Routine Barricade Inspect | BMONG | Approved | |
| 05/20/2019 | TDOT-EXCAV GENERAL INSPECTION | BMONG | Approved | TRAFFIC CONTROL HAS BEEN REMOVED |