Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address NEW:
5901 E SYLVANE ST
Apply Date:
02/07/2019
Applicant:
CARDNO INC
Description:
Air-Vacuum Excavation of 23 utility potholes 12" x 12" in size throughout side streets in area of Sahuara Ave and Sylvane St. for the design phase of Tucson Water San Paulo Phase III Project No CIP W071, see attached exhibit. CAPITAL PROJECT FOR TUCSON WATER; TUCSON WATER SAN PAULO PHASE III PROJECT NO CIP W071

Completed Inspections

Permit Status: Final
Permit Number: T19RW00700
Permit Description: Air-Vacuum Excavation of 23 utility potholes 12" x 12" in size throughout side streets in area of Sahuara Ave and Sylvane St. for the design phase of Tucson Water San Paulo Phase III Project No CIP W071, see attached exhibit. CAPITAL PROJECT FOR TUCSON WATER; TUCSON WATER SAN PAULO PHASE III PROJECT NO CIP W071
Total Completed Inspections - 1
Date Description Inspector Results Comments
03/19/2019 TDOT-EXCAV GENERAL INSPECTION BMONG Approved WORK HAS BEEN COMPLETED
NO ISSUES AT THIS TIME

Documents

File Name Document Type  
T19RW00700.PDF ROW-RIGHT OF WAY VIEW