Permit: T19RW00526
Permit Details
Apply Date:
01/30/2019
Applicant:
EL PASO NATURAL GAS
Description:
Crew will remove asphalt & dirt to expose and inspect pipeline. If defects are found, crew will replace or repair the pipeline, backfill w/dirt to 12", then use concrete slurry. New asphalt must match custom pavement thickeness will be applied when all digs are complete. 12th Ave, North of Veterans, within Bus Stop in front of 3553 S 12th Ave This section of 12th Av. is under a pavement cut moratorium . Additional pavement repairs will be required, 2" mill and fill will be need to be performed for 50' beyond each end of trench and entire width of effected lane.
Contractors:
- EPNG MAINTENANCE CREW SUPERINTENDENT
Completed Inspections
Permit Status: Final
Permit Number: T19RW00526
Permit Description: Crew will remove asphalt & dirt to expose and inspect pipeline. If defects are found, crew will replace or repair the pipeline, backfill w/dirt to 12", then use concrete slurry. New asphalt must match custom pavement thickeness will be applied when all digs are complete.
12th Ave, North of Veterans, within Bus Stop in front of 3553 S 12th Ave
This section of 12th Av. is under a pavement cut moratorium . Additional pavement repairs will be required, 2" mill and fill will be need to be performed for 50' beyond each end of trench and entire width of effected lane.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2019 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | Gas line was repaired and backfilled with slurry specific to Kindermorgan gas standards. No issues with repairs. Slurry backfill held up to super 16 load. Wheel chair ramp and curb were removed and replaced on the East side of 12th. All forms,Grade and concrete were checked and approved. Roadway was milled and replaced for roughly a 120 lf because of moritoruim. PAG 11 was specified and used. No issues with project and job is complete. |