Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
10215 E 5TH ST
Apply Date:
09/20/2019
Applicant:
ENGINEERING AND ENVIRONMENTAL CONSULTANTS INC
Description:
FUP FOR T19CM05852

Permit Reviews

Permit Number - T19OT00901
Permit Status: Final
Permit Description: FUP FOR T19CM05852
Start Date Submittal Complete Date Status  
09/20/2019 PLANS OK TO SUBMIT - FLOODPLAIN 09/20/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19OT00901
Permit Status: Final
Permit Description: FUP FOR T19CM05852
Total Outstanding Activity Conditions - 1
Date Name
09/20/2019 Floodplain Use Permit T19OT00901 09/20/2019 (No Elevation Certificate Required). The applicant is authorized to use a portion of the Coronado Ridge Wash City of Tucson Special Flood Hazard Area at 10215 E 5th St for the purpose of water well upgrades The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations require the issuance of an additional Floodplain Use Permit. The following conditions shall apply to this permit: 1. All work shall conform to the attached plans (T19CM05852) which are made part of this permit. 2. The existing drainage patterns at the property lines shall not be obstructed or changed. 3. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. 4. This permit becomes invalid and is subject to additional floodplain review, if any required development permit (s') changes the configuration of the structure and or site development. 5. Any future development of the sight including patio walls to be constructed will require a separate Floodplain Use Permit. This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions set forth in this permit are not complied with.

Documents

File Name Document Type  
FILLABLE FLOODPLAIN USE PERMIT APPLICATION.PDF DOCUMENTS VIEW
FP_PERMIT.PDF DOCUMENTS VIEW