Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19CM09358
Permit Details
Apply Date:
12/20/2019
Applicant:
TITAN SOLAR POWER ***APA***
Description:
E - INSTALL ROOFTOP SOLAR SYSTEM
Contractors:
- TITAN SOLAR POWER ***APA***
Permit Reviews
Permit Number - T19CM09358
Permit Status: Final
Permit Description: E - INSTALL ROOFTOP SOLAR SYSTEM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/29/2020 | REVISION - - 1ST | 01/31/2020 | COMPLETED |
12/20/2019 | RESIDENTIAL - BLDG/ZONING/ENGINE/WWM | 12/26/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM09358
Permit Status: Final
Permit Description: E - INSTALL ROOFTOP SOLAR SYSTEM
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
12/20/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
12/20/2019 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM09358
Permit Description: E - INSTALL ROOFTOP SOLAR SYSTEM
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/24/2020 | TEP CLEARANCE - PM | ESTEVENS | Approved | CODE DGC |
03/24/2020 | ELECTRIC - FINAL | ESTEVENS | Approved | The TEP clearance code is DGC. |
03/24/2020 | BUILDING - FINAL | ESTEVENS | Approved |