Permit Details

Status:
Expired
Type:
Commercial Building
Address NEW:
988 E UNIVERSITY BL
Apply Date:
12/06/2019
Applicant:
Lisa Bowers
Description:
TI:COFFEE SHOP

Permit Reviews

Permit Number - T19CM08973
Permit Status: Expired
Permit Description: TI:COFFEE SHOP
Start Date Submittal Complete Date Status  
04/23/2020 POST 3RD PARTY REVIEW 04/23/2020 ACTIVE Review Details
12/06/2019 COMMERCIAL - TI 04/23/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM08973
Permit Status: Expired
Permit Description: TI:COFFEE SHOP
Total Outstanding Activity Conditions - 4
Date Name
04/23/2020 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
04/23/2020 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/23/2020 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/06/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Expired
Permit Number: T19CM08973
Permit Description: TI:COFFEE SHOP
Total Completed Inspections - 26
Date Description Inspector Results Comments
06/17/2020 COT - LCPL - Rough Soil Passed {Activity date: 06/17/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved. Waste lines, sewer line, grease trap in place. Ok to cover progress areas.
}
07/10/2020 PDSD Building Division - TEP PM Clearance Passed {Activity date: 07/10/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - CODE INCR/SVC DIS TO METER AND INSIDE PANEL.}
08/04/2020 COT - LCEL - Electrical Intermediate Passed {Activity date: 08/04/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 07/10/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for TEP clearance INCR
Service disconnect to meter and inside panel}
08/04/2020 COT - LCPL - Plumbing Intermediate Passed {Activity date: 08/04/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved}
08/04/2020 COT - LCME - Mechanical Intermediate Passed {Activity date: 08/04/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 06/17/2020; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Smoke test on hood duct system. Ok to double wrap duct.}
09/23/2020 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 09/23/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by JSCHNEI2 - Approved. Ok to place ceiling screen system.}
03/23/2021 COT - HCBU - Interior Shear Bracing Passed {Activity date: 03/23/2021; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } ; {Activity date: 08/17/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved. Ok to tape throughout.} ; {Activity date: 06/01/2020; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. South half of building ceiling, double layered sheet rock. Ok to tape progress area.}
03/24/2021 COT - LCPL - Gas Pressure Test Passed {Activity date: 03/24/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved. Gas lines pressure tested at 15 psi. Will set meter when hood ansul system is installed.}
04/08/2021 COT - LCBU - Building Above Ceiling Passed {Activity date: 04/08/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - }
04/08/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/08/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - }
04/08/2021 COT - LCBU - Framing Passed {Activity date: 04/08/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - }
04/08/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/08/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - }
04/08/2021 TRSP - ROW - Final/Close-Out Passed {Activity date: 04/08/2021; Status: Approved; Inspector: bravin; Comment: Entered by MBRAVIN1 - no Right of way issues}
04/08/2021 COT - LCEL - Electrical Final Passed {Activity date: 04/08/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - }
04/08/2021 ENGR Engineering Final Passed {Activity date: 04/08/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - }
04/08/2021 PDSD Building Division - Sign Final Passed {Activity date: 04/08/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } ; {Activity date: 04/08/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - }
04/16/2021 COT - FCON - Sprinkler - Final Passed {Activity date: 04/16/2021; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
04/16/2021 COT - FCON - Hood System - Final Passed {Activity date: 04/16/2021; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
04/19/2021 COT - LCBU - Building Final Passed {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - APPROVED PENDING FIRE FINAL} ; {Activity date: 04/16/2021; Status: Cancelled; Inspector: RELEFANTE; Comment: Entered by VLEON1 - }
04/19/2021 COT - LCME - Mechanical Final Passed {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } ; {Activity date: 04/08/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - PARTIAL NEED HOOD TEST RESULTS} ; {Activity date: 04/05/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF AIR BALANCE REPORT COMPLETED}
04/19/2021 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - }
04/19/2021 COT - LCBU - Preslab Passed {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - }
04/19/2021 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - }
04/19/2021 COT - FCON - Fire - Final Passed {Activity date: 04/19/2021; Status: Approved; Inspector: MRoss; Comment: Entered by MROSS2 - -Operational permit required for places of assembly through TFD. Application was left on site
-Mount maximum occupancy load sign
-Mount fire extinguisher in front lobby area
} ; {Activity date: 04/16/2021; Status: Partial Approval; Inspector: wmotto; Comment: Entered by WMOTTO1 - 1. Need knox boxes installed one on sprinkler riser door and one located at the front entrance.}
04/19/2021 COT - LCPL - Plumbing Final Passed {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } ; {Activity date: 04/05/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED}
04/19/2021 COT - LCBU - Masonry Pregrout Passed {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - }