Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19CM08973
Permit Details
Apply Date:
12/06/2019
Applicant:
Lisa Bowers
Description:
TI:COFFEE SHOP
Permit Reviews
Permit Number - T19CM08973
Permit Status: Expired
Permit Description: TI:COFFEE SHOP
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/23/2020 | POST 3RD PARTY REVIEW | 04/23/2020 | ACTIVE |
12/06/2019 | COMMERCIAL - TI | 04/23/2020 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM08973
Permit Status: Expired
Permit Description: TI:COFFEE SHOP
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/23/2020 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
04/23/2020 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
04/23/2020 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
12/06/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM08973
Permit Description: TI:COFFEE SHOP
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/17/2020 | COT - LCPL - Rough Soil | Passed | {Activity date: 06/17/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved. Waste lines, sewer line, grease trap in place. Ok to cover progress areas. } |
|
07/10/2020 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 07/10/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - CODE INCR/SVC DIS TO METER AND INSIDE PANEL.} | |
08/04/2020 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 08/04/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 07/10/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for TEP clearance INCR Service disconnect to meter and inside panel} |
|
08/04/2020 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 08/04/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved} | |
08/04/2020 | COT - LCME - Mechanical Intermediate | Passed | {Activity date: 08/04/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 06/17/2020; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Smoke test on hood duct system. Ok to double wrap duct.} | |
09/23/2020 | COT - LCEL - Electrical Above Ceiling | Passed | {Activity date: 09/23/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by JSCHNEI2 - Approved. Ok to place ceiling screen system.} | |
03/23/2021 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 03/23/2021; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } ; {Activity date: 08/17/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved. Ok to tape throughout.} ; {Activity date: 06/01/2020; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. South half of building ceiling, double layered sheet rock. Ok to tape progress area.} | |
03/24/2021 | COT - LCPL - Gas Pressure Test | Passed | {Activity date: 03/24/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Approved. Gas lines pressure tested at 15 psi. Will set meter when hood ansul system is installed.} | |
04/08/2021 | COT - LCBU - Building Above Ceiling | Passed | {Activity date: 04/08/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } | |
04/08/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/08/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } | |
04/08/2021 | COT - LCBU - Framing | Passed | {Activity date: 04/08/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } | |
04/08/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 04/08/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } | |
04/08/2021 | TRSP - ROW - Final/Close-Out | Passed | {Activity date: 04/08/2021; Status: Approved; Inspector: bravin; Comment: Entered by MBRAVIN1 - no Right of way issues} | |
04/08/2021 | COT - LCEL - Electrical Final | Passed | {Activity date: 04/08/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } | |
04/08/2021 | ENGR Engineering Final | Passed | {Activity date: 04/08/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } | |
04/08/2021 | PDSD Building Division - Sign Final | Passed | {Activity date: 04/08/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } ; {Activity date: 04/08/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } | |
04/16/2021 | COT - FCON - Sprinkler - Final | Passed | {Activity date: 04/16/2021; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - } | |
04/16/2021 | COT - FCON - Hood System - Final | Passed | {Activity date: 04/16/2021; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - } | |
04/19/2021 | COT - LCBU - Building Final | Passed | {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - APPROVED PENDING FIRE FINAL} ; {Activity date: 04/16/2021; Status: Cancelled; Inspector: RELEFANTE; Comment: Entered by VLEON1 - } | |
04/19/2021 | COT - LCME - Mechanical Final | Passed | {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } ; {Activity date: 04/08/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - PARTIAL NEED HOOD TEST RESULTS} ; {Activity date: 04/05/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF AIR BALANCE REPORT COMPLETED} | |
04/19/2021 | COT - LCME - Mechanical Above Ceiling | Passed | {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } | |
04/19/2021 | COT - LCBU - Preslab | Passed | {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } | |
04/19/2021 | COT - LCPL - Plumbing Above Ceiling | Passed | {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } | |
04/19/2021 | COT - FCON - Fire - Final | Passed | {Activity date: 04/19/2021; Status: Approved; Inspector: MRoss; Comment: Entered by MROSS2 - -Operational permit required for places of assembly through TFD. Application was left on site -Mount maximum occupancy load sign -Mount fire extinguisher in front lobby area } ; {Activity date: 04/16/2021; Status: Partial Approval; Inspector: wmotto; Comment: Entered by WMOTTO1 - 1. Need knox boxes installed one on sprinkler riser door and one located at the front entrance.} |
|
04/19/2021 | COT - LCPL - Plumbing Final | Passed | {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } ; {Activity date: 04/05/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED} | |
04/19/2021 | COT - LCBU - Masonry Pregrout | Passed | {Activity date: 04/19/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } |