Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19CM08924
Permit Details
Apply Date:
12/05/2019
Applicant:
Solgen Power
Description:
E - INSTALL ROOFTOP SOLAR SYSTEM
Permit Reviews
Permit Number - T19CM08924
Permit Status: Expired
Permit Description: E - INSTALL ROOFTOP SOLAR SYSTEM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/17/2020 | REVISION - - 1ST | 01/22/2020 | COMPLETED |
12/05/2019 | RESIDENTIAL - BLDG/ZONING/ENGINE/WWM | 12/06/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM08924
Permit Status: Expired
Permit Description: E - INSTALL ROOFTOP SOLAR SYSTEM
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/05/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T19CM08924
Permit Status: Expired
Permit Description: E - INSTALL ROOFTOP SOLAR SYSTEM
Date | Description | Comments |
---|---|---|
12/05/2019 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM08924
Permit Description: E - INSTALL ROOFTOP SOLAR SYSTEM
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/15/2020 | BULD - Electrical Clearance | Passed | {Activity date: 01/15/2020; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DMERANZ1 - CODE INCR} | |
01/21/2020 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 01/21/2020; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DMERANZ1 - INCR/DGC} | |
01/21/2020 | RSBU - Building Final | Passed | {Activity date: 01/21/2020; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - RVI - CLEAR INCR, CLEAR DGC} ; {Activity date: 01/16/2020; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - REMOVE Line side tap for Existing Disconnect and Provide Over current protection for Conductors. Provide Site equipment plaque on load center.} | |
01/21/2020 | COT - RSEL - Service Upgrade | Passed | {Activity date: 01/21/2020; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - RVI - CLEAR INCR, CLEAR DGC} ; {Activity date: 01/15/2020; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - RVI - CLEAR INCR} ; {Activity date: 01/15/2020; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Powerkill will not occur until 10:00AM; builder agreed to use remote inspection for this. } |
|
01/21/2020 | COT - RSEL - Electrical Final | Passed | {Activity date: 01/21/2020; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - RVI - CLEAR INCR, CLEAR DGC} ; {Activity date: 01/16/2020; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - REMOVE Line side tap for Existing Disconnect and Provide Over current protection for Conductors. Provide Site equipment plaque on load center.} |