Permit: T19CM06564
Permit Details
Status:
Expired
Type:
Residential Building - One or Two Family
Address:
8683 E ULTRA DR
Address NEW:
8683 E ULTRA DR
Apply Date:
09/10/2019
Applicant:
Paul Richard
Description:
SFR PEPP1175 T19-M0090
Permit Reviews
Permit Number - T19CM06564
Permit Status: Expired
Permit Description: SFR PEPP1175 T19-M0090
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/10/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 09/10/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM06564
Permit Status: Expired
Permit Description: SFR PEPP1175 T19-M0090
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/10/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 09/10/2019 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM06564
Permit Description: SFR PEPP1175 T19-M0090
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2019 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/17/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/04/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Cancel by contractor} ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Back pitch at DWV. Verified layout of property line, minimum 3 foot clearance required from face of electrical panel on adjacent building.} | |
| 10/18/2019 | COT - RSPL - Sewer | Passed | {Activity date: 10/18/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/17/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Test fail.} ; {Activity date: 10/04/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Cancel by contractor} ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Back pitch at DWV. Verified layout of property line, minimum 3 foot clearance required from face of electrical panel on adjacent building.} | |
| 10/18/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/18/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/17/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Test fail.} ; {Activity date: 10/04/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Cancel by contractor} ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Back pitch at DWV. Verified layout of property line, minimum 3 foot clearance required from face of electrical panel on adjacent building.} | |
| 10/28/2019 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/28/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
| 10/28/2019 | COT - RSBU - Preslab | Passed | {Activity date: 10/28/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
| 10/28/2019 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/28/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
| 10/28/2019 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/28/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
| 11/25/2019 | COT - RSBU - Roof Nailing | Passed | {Activity date: 11/25/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
| 11/25/2019 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 11/25/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
| 12/17/2019 | COT - RSEL - Construction Power | Passed | {Activity date: 12/17/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - ECO OK to clear.} | |
| 12/17/2019 | BULD - Electrical Clearance | Passed | {Activity date: 12/17/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - CODE ECO} | |
| 12/26/2019 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 12/26/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
| 01/07/2020 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 01/07/2020; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/26/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Work not complete.} | |
| 01/07/2020 | COT - LCBU - Framing | Passed | {Activity date: 01/07/2020; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/26/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Work not complete.} | |
| 01/07/2020 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 01/07/2020; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/26/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Work not complete.} | |
| 01/07/2020 | RSME - Mechanical Progress | Passed | {Activity date: 01/07/2020; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/26/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Work not complete.} | |
| 01/29/2020 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 01/29/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } | |
| 03/26/2020 | COT - RSME - Mechanical Final | Passed | {Activity date: 03/26/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - } | |
| 03/26/2020 | COT - RSEL - Outdoor Lighting | Passed | {Activity date: 03/26/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - RVI} | |
| 03/26/2020 | COT - RSPL - Plumbing Final | Passed | {Activity date: 03/26/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - Clearance SWG OK to connect. } |
|
| 03/26/2020 | COT - BULD - SWG Clearance | Passed | {Activity date: 03/26/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - } | |
| 04/01/2020 | RSBU - Building Final | Passed | {Activity date: 04/01/2020; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by SFLORES2 - RVI} ; {Activity date: 03/27/2020; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - Pending other inspections.} ; {Activity date: 03/26/2020; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - Pending other inspections.} | |
| 04/01/2020 | COT - RSEL - Electrical Final | Passed | {Activity date: 04/01/2020; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by SFLORES2 - RVI} ; {Activity date: 03/27/2020; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by SFLORES2 - 1-Install missing smoke detector, and interconnect all of them. 2-Change closet light to LED. 3-Verify breaker size for AC compressor circuit.} ; {Activity date: 03/26/2020; Status: Correction Required; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - 1-Install missing smoke detector, and interconnect all of them. 2-Change closet light to LED. 3-Verify breaker size for AC compressor circuit.} |