Permit: T19CM06559
Permit Details
Apply Date:
09/10/2019
Applicant:
RITEWAY VENTILATING *APA*
Description:
E - 80K 2.5 TON GAS SPLIT SYSTEM
Contractors:
- RITEWAY VENTILATING *APA*
Permit Reviews
Permit Number - T19CM06559
Permit Status: Final
Permit Description: E - 80K 2.5 TON GAS SPLIT SYSTEM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/10/2019 | WALK THRU - RES | 09/25/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM06559
Permit Status: Final
Permit Description: E - 80K 2.5 TON GAS SPLIT SYSTEM
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/10/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM06559
Permit Description: E - 80K 2.5 TON GAS SPLIT SYSTEM
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2019 | MECHANICAL - FINAL | MRAMBER | Approved | flue pipe Not properly installed, water heater installed without permit, temperature and pressure relief valve not properly terminated. |
| 11/04/2019 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | flue pipe Not properly installed, water heater installed without permit, temperature and pressure relief valve not properly terminated. |
| 11/04/2019 | ELECTRIC - FINAL | MRAMBER | Approved |