Permit Details

Status:
Final
Type:
SINGLE FAMILY ADDITION
Address:
2301 E 7TH ST
Address NEW:
2301 E 7TH ST
Apply Date:
08/20/2019
Applicant:
REILLY JONATHAN R & LORRI A K CP/RS
Description:
ADD GARAGE AND BEDROOM SUITE

Permit Reviews

Permit Number - T19CM05974
Permit Status: Final
Permit Description: ADD GARAGE AND BEDROOM SUITE
Start Date Submittal Complete Date Status  
04/15/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 05/01/2020 COMPLETED Review Details
08/20/2019 RESIDENTIAL - BLDG/ZONING-WALKTHRU 10/23/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM05974
Permit Status: Final
Permit Description: ADD GARAGE AND BEDROOM SUITE
Total Outstanding Activity Conditions - 1
Date Name
08/20/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T19CM05974
Permit Description: ADD GARAGE AND BEDROOM SUITE
Total Completed Inspections - 16
Date Description Inspector Results Comments
07/24/2020 PLUMBING - ROUGH, SOIL TTREMBULAK Approved Approved
07/24/2020 PLUMBING - ROUGH, SOIL IVR USER Approved IVRS - RI canceled
08/06/2020 BUILDING PRE-SLAB WGALLAGHER Approved Approved
09/09/2020 EXCAVATION/LAYOUT REBAR & ZON ESTEVENS Approved Approved by Wayne. 8/05/ 2020
09/09/2020 ROOF NAILING ESTEVENS Approved Both are approved.
09/09/2020 EXT METAL CLIPS/EXT SHEATHING ESTEVENS Approved Both are approved.
09/09/2020 EXCAVATION/LAYOUT REBAR & ZON ESTEVENS Approved Approved by Tom. 8/05/ 2020
11/23/2020 GAS CLEARANCE ESTEVENS Approved CODE
11/23/2020 MECHANICAL - INTERMEDIATE ESTEVENS Approved All four are approved. Southwest gas clearance is required.
11/23/2020 PLUMBING - GAS PRESSURE TEST ESTEVENS Approved All four are approved. Southwest gas clearance is required.
11/23/2020 RESIDENTIAL INTERMEDIATE ESTEVENS Approved All four are approved. Southwest gas clearance is required.
11/23/2020 FRAMING ESTEVENS Approved All four are approved. Southwest gas clearance is required.
07/29/2021 BUILDING - FINAL DQUINN Approved Ap

Close permit
07/29/2021 ELECTRIC - FINAL DQUINN Approved Ap

Close permit
07/29/2021 PLUMBING - FINAL DQUINN Approved Ap

Close permit
07/29/2021 MECHANICAL - FINAL DQUINN Approved Ap

Close permit

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
OBA.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW