Permit: T19CM05735
Permit Details
Apply Date:
08/09/2019
Applicant:
GEORGE ZAZUETA
Description:
2 CAR GARAGE AND ART STUDIO W/ BATH ADDITION T19DV07191
Permit Reviews
Permit Number - T19CM05735
Permit Status: Final
Permit Description: 2 CAR GARAGE AND ART STUDIO W/ BATH ADDITION
T19DV07191
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/15/2020 | REVISION - - 2ND | 02/21/2020 | COMPLETED |
02/21/2020 | REVISION - - 2ND | 03/02/2020 | COMPLETED |
08/09/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 08/16/2019 | COMPLETED |
10/29/2019 | REVISION - - 1ST | 11/15/2019 | COMPLETED |
12/05/2019 | REVISION - - 2ND | 01/15/2020 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM05735
Permit Status: Final
Permit Description: 2 CAR GARAGE AND ART STUDIO W/ BATH ADDITION
T19DV07191
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/09/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM05735
Permit Description: 2 CAR GARAGE AND ART STUDIO W/ BATH ADDITION
T19DV07191
Total Completed Inspections - 17
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/06/2019 | BUILDING PRE-SLAB | JBURGE | Approved | Ok to place concrete. |
10/01/2019 | ROOF NAILING | JCLAXTON | Approved | ADDED HALLWAY INSPECTION |
10/01/2019 | EXT METAL CLIPS/EXT SHEATHING | JCLAXTON | Approved | ADDED HALLWAY INSPECTION |
10/23/2019 | FRAMING | ESTEVENS | Approved | Contractor is not building according to plan. He added an extra storage structure to the west side of the building. This structure does not meet zoning setbacks. The garage structure is approximately two feet taller than the plan. The contractor used trusses instead of TJI’s. I spoke to the owner of the property and informed him to build according to the plan or submit as built plans for approval. |
10/23/2019 | RESIDENTIAL INTERMEDIATE | BSTEVENS | Approved | CANCELED BY INSPECTOR E. STEVENS |
10/23/2019 | FRAMING | BSTEVENS | Approved | CANCELED BY INSPECTOR E. STEVENS |
03/24/2020 | ELECTRIC - UNDERGROUND | MRAMBER | Approved | |
03/24/2020 | ELECTRIC - INTERMEDIATE | MRAMBER | Approved | |
10/19/2021 | MECHANICAL - INTERMEDIATE | WGALLAGHER | Approved | Approved |
11/17/2021 | PLUMBING - INTERMEDIATE | WGALLAGHER | Approved | |
11/17/2021 | PLUMBING - FINAL | WGALLAGHER | Approved | |
11/17/2021 | PLUMBING - YARD WTR LINE/TEST | WGALLAGHER | Approved | |
11/17/2021 | EXCAVATION/LAYOUT REBAR & ZON | WGALLAGHER | Approved | |
11/17/2021 | BUILDING - FINAL | WGALLAGHER | Approved | Approved |
11/17/2021 | ELECTRIC - FINAL | WGALLAGHER | Approved | Approved |
11/17/2021 | PLUMBING - ROUGH, SOIL | WGALLAGHER | Approved | Approved |
11/17/2021 | MECHANICAL - FINAL | WGALLAGHER | Approved | Approved |