Permit: T19CM05503
Permit Details
Apply Date:
08/01/2019
Applicant:
LANNING, ROBERT SCOTT
Description:
TI: OFFICE
Contractors:
- SOUTHWEST URBAN BUILDERS LLC
Permit Reviews
Permit Number - T19CM05503
Permit Status: C of o
Permit Description: TI: OFFICE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/01/2019 | COMMERCIAL - TI | 08/09/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM05503
Permit Status: C of o
Permit Description: TI: OFFICE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/01/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T19CM05503
Permit Description: TI: OFFICE
Total Completed Inspections - 27
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/01/2019 | PLUMBING - FINAL | RSHERRY | Approved | WATER DISINFECTION REPORT REQUIRED |
08/07/2019 | MECHANICAL - FINAL | RSHERRY | Approved | AIR BALANCE REPORT REQUIRED |
11/21/2019 | U VALUE FOR WINDOW | JBURGE | Approved | Windows meet Historical Society standards. |
11/21/2019 | ROOF NAILING | JBURGE | Approved | |
11/21/2019 | PLUMBING - YARD WTR LINE/TEST | JBURGE | Approved | |
11/21/2019 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | Ok to cover progress area. |
12/04/2019 | TEP CLEARANCE - PM | ESTEVENS | Approved | CODE TMPP |
12/04/2019 | ELECTRIC - CONSTRUCTION POWER | ESTEVENS | Approved | |
01/21/2020 | FRAMING | TVALENCIA | Approved | |
02/24/2020 | MECHANICAL - INTERMEDIATE | JBURGE | Approved | In wall mechanical is in place, thermostat lines in place. |
02/24/2020 | PLUMBING - INTERMEDIATE | JBURGE | Approved | |
02/24/2020 | ELECTRIC - TEMPORARY SERVICE | JBURGE | Approved | Temporary electric service is in place. |
02/24/2020 | ELECTRIC - UNDERGROUND | JBURGE | Approved | |
02/24/2020 | ELECTRIC - UFER | JBURGE | Approved | |
02/24/2020 | BUILDING ABOVE CEILING | JBURGE | Approved | |
03/03/2020 | ELECTRIC - SERVICE UPGRADE | ESTEVENS | Approved | The TEP clearance code is INCR. |
03/03/2020 | ELECTRIC - ABOVE CEILING | ESTEVENS | Approved | |
03/03/2020 | ELECTRIC - INTERMEDIATE | ESTEVENS | Approved | |
03/19/2020 | REINFORCED MASONRY PRE-GROUT | JBURGE | Approved | |
04/10/2020 | PLUMBING - BACK WATER VALVE | TVALENCIA | Approved | |
04/10/2020 | ELECTRIC - OUTDOOR LIGHTING | TVALENCIA | Approved | |
04/17/2020 | ELECTRIC - FINAL | TVALENCIA | Approved | |
04/17/2020 | OUTDOOR LIGHTING FINAL | TVALENCIA | Approved | |
04/17/2020 | BUILDING - FINAL | TVALENCIA | Approved | |
04/17/2020 | RESIDENTIAL INTERMEDIATE | TVALENCIA | Approved | |
05/12/2020 | ENGINEERING - FINAL | DROBERTS | Approved | THIS INSPECTION IS BEING APPROVED AT THIS TIME SINCE IT HAS BEEN ACCEPTED BY THE TRANSPORTATION DEPARTMENT. ALL PREVIOUSLY NOTED COMMENTS ARE ISSUES WITHIN THE RIGHTS OF WAY AND IS APPROVED WITH THE APPROVAL OF THE BUILDING OFFICIAL ON 5/12/2020. BELOW IS THE LIST OF THE ORIGINAL COMMENTS MADE DURING MY INSPECTION OF THE SITE ON 4/17/2020: IS PARTIALED AT THIS TIME DUE TO THE SITE WORK IS NOT COMPLETE. THE FOLLOWING ITEMS HAVE BEEN NOTED INCORRECT DURING THIS SITE VISIT: 1) THE ADA PARKING SPACE IS NOT IN THE LOCATION THAT IS SHOWN ON THE APPROVED PLANS AND IS NONCOMPLIANT. PROVIDE US WITH APPROVED REVISED DRAWINGS FOR THIS CHANGE, OR CONSTRUCT THIS AS IT HAS BEEN APPROVED. ALSO THE RUNNING SLOPE OF THE ROADWAY WHERE THE PARKING SPACE IS TO BE CONSTRUCTED IS BETWEEN 2.6% AND 4.0%, THIS NEEDS TO BE 2% OR LESS IN ALL DIRECTIONS WHEN IT IS INSPECTED. 2) THE SIDEWALK THAT IS SHOWN IN THE AREA BETWEEN THE APPROVED PARKING SPACE AND THE ACCESS TO THE BUILDING IS NON COMPLIANT FOR THE CROSS SLOPE. CURRENTLY THE SLOPES IN THIS AREA VARY BETWEEN 2.6% TO OVER 4%, THIS WILL NEED TO BE ADDRESSED FOR THE PARKING SPACE/ACCESS AISLE TO BE COMPLIANT. ALSO AT THE DOORWAY THERE IS NOT A LANDING AT THE TOP OF THE RAMP TO ALLOW FOR A POINT OF REST WHILE OPENING THE DOOR, THE LANDING IS ON THE INSIDE OF THE DOOR. 3) THE ISSUES NOTED IN THIS AREA ARE THE RESPONSIBILITY OF THE RIGHT OF WAY DEPARTMENT FOR THE CITY OF TUCSON TRANSPORTATION DEPT. THE ACCESS RAMP LOCATED AT THE SOUTHWEST CORNER OF THIS BUILDING IS NON-COMPLIANT IN THE FOLLOWING AREAS. IT IS MISSING THE KICK PLATE ON THE RIGHT SIDE OF THE HANDRAIL GOING UP THE RAMP AND THE HANDRAIL ON THE LEFT SIDE OF THE SAME RAMP GOING UP. 4) COMPLETE THE LANDSCAPING AROUND THIS SITE PRIOR TO RECALLING THIS INSPECTION AGAIN. ALL DISTURBED AREAS WILL NEED TO HAVE SOME TYPE OF LANDSCAPING MATERIAL APPLIED EITHER PLANTS, DECOMPSED GRANITE, OR HYDROSEED PRIOR TO APPROVAL OF THE SITE. |
05/12/2020 | ENGINEERING - FINAL | DROBERTS | Approved | PARTIAL AT THIS TIME AS NOTED ON THE PREVIOUS INSPECTION FOR THIS SITE IN APRIL OF THIS YEAR. I AM WAITING ON A DECISION FROM C.O.T. TRANSPORTATION SINCE MY COMMENTS REFER TO WORK DONE IN THE RIGHTS OF WAY IN REGARDS TO THE NONCOMPLIANT ADA PARKING SPACE, ACCESS AISLE, AND PATHWAY INTO THE BUILDING FROM SIMPSON STREET. |