Permit: T19CM05417
Permit Details
Status:
Expired
Type:
Residential Building - One or Two Family
Address:
10030 E LEILA DR
Address NEW:
10030 E LEILA DR
Apply Date:
07/30/2019
Applicant:
Description:
FIRE DAMAGE REPAIR - T19DV04241
Permit Reviews
Permit Number - T19CM05417
Permit Status: Expired
Permit Description: FIRE DAMAGE REPAIR - T19DV04241
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/30/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 07/30/2019 | COMPLETED |
| 09/12/2019 | REVISION - - 1ST | 09/12/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM05417
Permit Status: Expired
Permit Description: FIRE DAMAGE REPAIR - T19DV04241
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/30/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 07/30/2019 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM05417
Permit Description: FIRE DAMAGE REPAIR - T19DV04241
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2019 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 08/20/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
| 10/11/2019 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 10/11/2019; Status: Approved; Inspector: JCLAXTON; Comment: Entered by DMERANZ1 - Clear SWG. Ok to insulate and drywall.} ; {Activity date: 10/10/2019; Status: Correction Required; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - MUST PROVIDE WIRING FOR HARD WIRED SMOKE DETECTORS. PROVIDE PLATFORM IN GARAGE FOR WATER HEATER. IGNITION SOURCE MUST BE 18" ABOVE FLOOR. RE-CALL FOR SITE INSPECTION.} ; {Activity date: 10/04/2019; Status: Denied; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Register boot boxes to be framed on three sides, gas pressure test fail, kitchen exhaust not properly terminated, all top plates to be fire caulked at penetrations, provide hardwired smoke alarms in bedrooms And areas leading to the bedrooms.} |
|
| 10/11/2019 | COT - BULD - SWG Clearance | Passed | {Activity date: 10/11/2019; Status: Approved; Inspector: JCLAXTON; Comment: Entered by DMERANZ1 - } | |
| 10/11/2019 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 10/11/2019; Status: Approved; Inspector: JCLAXTON; Comment: Entered by DQUINN1 - } | |
| 12/20/2019 | COT - RSBU - Roof Nailing | Passed | {Activity date: 12/20/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DQUINN1 - RVI} ; {Activity date: 08/30/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - No roof access.} ; {Activity date: 08/20/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Damaged trusses to be approved by structural engineer, trusses are not to bear at non load points, Complete all intermediates prior to framing inspection.} | |
| 12/20/2019 | COT - RSME - Mechanical Final | Passed | {Activity date: 12/20/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DQUINN1 - RVI} | |
| 12/20/2019 | COT - LCBU - Framing | Passed | {Activity date: 12/20/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DQUINN1 - RVI} ; {Activity date: 10/10/2019; Status: Correction Required; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - MUST PROVIDE WIRING FOR HARD WIRED SMOKE DETECTORS. PROVIDE PLATFORM IN GARAGE FOR WATER HEATER. IGNITION SOURCE MUST BE 18" ABOVE FLOOR. RE-CALL FOR SITE INSPECTION.} ; {Activity date: 08/30/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Truss repair OK per engineer drawing} ; {Activity date: 08/20/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Damaged trusses to be approved by structural engineer, trusses are not to bear at non load points, Complete all intermediates prior to framing inspection.} | |
| 12/20/2019 | RSBU - Building Final | Passed | {Activity date: 12/20/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DQUINN1 - RVI} | |
| 12/20/2019 | COT - RSEL - Outdoor Lighting | Passed | {Activity date: 12/20/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DQUINN1 - RVI} | |
| 12/20/2019 | COT - RSPL - Plumbing Final | Passed | {Activity date: 12/20/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DQUINN1 - RVI} | |
| 12/20/2019 | COT - RSEL - Electrical Final | Passed | {Activity date: 12/20/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by DQUINN1 - RVI} |