Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Address NEW:
2500 E GRANT RD 182
Apply Date:
07/18/2019
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
RESTAURANT
Contractors:
  • DIVISION II CONSTRUCTION COMPANY

Permit Reviews

Permit Number - T19CM05119
Permit Status: C of o
Permit Description: RESTAURANT
Start Date Submittal Complete Date Status  
07/18/2019 PLANS OK TO SUBMIT - COMM 07/22/2019 COMPLETED Review Details
07/23/2019 3RD PARTY REVIEW - COMMERCIAL TI 09/16/2019 COMPLETED Review Details
09/16/2019 POST 3RD PARTY REVIEW 09/26/2019 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T19CM05119
Permit Status: C of o
Permit Description: RESTAURANT
Total Outstanding Activity Conditions - 1
Date Name
07/18/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T19CM05119
Permit Description: RESTAURANT
Total Completed Inspections - 37
Date Description Inspector Results Comments
10/17/2019 PLUMBING - ROUGH, SOIL RCHANDLER Approved
10/28/2019 BUILDING PRE-SLAB ESTEVENS Approved
10/28/2019 ELECTRIC - UNDERGROUND ESTEVENS Approved
10/28/2019 PLUMBING - PRE SLAB ESTEVENS Approved
11/06/2019 FRAMING DQUINN Approved Snooze patio roof column footings ok to pour
12/20/2019 ELECTRIC - INTERMEDIATE ESTEVENS Approved Ok to drywall one side.
12/30/2019 PLUMBING - INTERMEDIATE RCHANDLER Approved Note: Inspection history unavailable at this time.
01/22/2020 TEP CLEARANCE - PM DQUINN Approved #182 CODE ECO
02/12/2020 GAS CLEARANCE ESTEVENS Approved
02/12/2020 PLUMBING - GAS PRESSURE TEST ESTEVENS Approved SWG clearance is required.
02/12/2020 PLUMBING - ABOVE CEILING ESTEVENS Approved
02/28/2020 MECHANICAL - ABOVE CEILING DQUINN Approved
02/28/2020 ELECTRIC - ABOVE CEILING DQUINN Approved
02/28/2020 BUILDING ABOVE CEILING DQUINN Approved
03/05/2020 MECHANICAL - FINAL RSHERRY Approved REVIEW OF AIR BALANCE REPORT COMPLETED
03/05/2020 ELECTRIC - OUTDOOR LIGHTING DQUINN Approved PER 2099 AP
03/05/2020 MECHANICAL - INTERMEDIATE DQUINN Approved
03/05/2020 MECHANICAL - HOODS DQUINN Approved
03/05/2020 MECHANICAL - FINAL DQUINN Approved
03/05/2020 MECHANICAL - HOOD SYSTEMS DQUINN Approved
03/05/2020 OUTDOOR LIGHTING FINAL DQUINN Approved
03/05/2020 SIGN - FINAL DROBERTS Approved
03/05/2020 NPPO - FINAL DROBERTS Approved
03/05/2020 RIGHT OF WAY - FINAL DR Approved
03/06/2020 FIRE - KITCHEN EXH HOOD FINAL JPEELDAVIS Approved
03/06/2020 PLUMBING - FINAL DQUINN Approved
03/06/2020 PLUMBING - GAS PRESS TEST FNL DQUINN Approved
03/06/2020 SHEET ROCK NAILING DQUINN Approved
03/06/2020 FIRE - KITCHEN EXH HOOD FINAL JPEELDAVIS Approved OK FOR TCO TO OCCUPY
- Electrical panels need schedules and labels
-Re-check the emergency and exit lights for proper operation
- Mount fire extingusihers
- Add notification device to walk-in-cooler per the fire alarm plans
- Remove the ground fault from the fire alam system for final
- Reuqires as built drawings for the fire alarm system
- Pay re-inspection fees prior to calling back in
03/06/2020 FIRE SPKLR - FINAL JPEELDAVIS Approved But we need to look at the outside awning that might have effected the shell fire sprinkler scope of work. Get with Harvey
03/12/2020 LANDSCAPE - FINAL BBENEDON Approved
03/12/2020 ENGINEERING - FINAL BBENEDON Approved
03/12/2020 ELECTRIC - FINAL ESTEVENS Approved
03/31/2020 FIRE - FINAL MBrown Approved
03/31/2020 FIRE - ALARM FINAL MBrown Approved
04/07/2020 BUILDING - FINAL ESTEVENS Approved RVI
04/07/2020 BUILDING - FINAL estevens Approved