Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Apply Date:
06/21/2019
Applicant:
K B HOME OF TUCSON *APA*
Description:
SFR KBHO146519 T19-M0055
Contractors:
  • K B HOME OF TUCSON *APA*

Permit Reviews

Permit Number - T19CM04465
Permit Status: Final
Permit Description: SFR KBHO146519 T19-M0055
Start Date Submittal Complete Date Status  
06/21/2019 RESIDENTIAL - BLDG/ZONING-WALKTHRU 06/21/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM04465
Permit Status: Final
Permit Description: SFR KBHO146519 T19-M0055
Total Outstanding Activity Conditions - 1
Date Name
06/21/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T19CM04465
Permit Description: SFR KBHO146519 T19-M0055
Total Completed Inspections - 26
Date Description Inspector Results Comments
06/25/2019 PLUMBING - BACK WATER VALVE DQUINN Approved
06/25/2019 PLUMBING - PRE SLAB DQUINN Approved
06/25/2019 PLUMBING - SEWER HCS CONNECT DQUINN Approved
06/27/2019 EXCAVATION/LAYOUT REBAR & ZON DMUNIZ Approved
06/27/2019 BUILDING PRE-SLAB DMUNIZ Approved
06/27/2019 ELECTRIC - UFER DMUNIZ Approved
06/27/2019 PLUMBING - ROUGH, SOIL DMUNIZ Approved
06/27/2019 PLUMBING - YARD WTR LINE/TEST DMUNIZ Approved
07/03/2019 EXT METAL CLIPS/EXT SHEATHING DQUINN Approved
07/03/2019 ROOF NAILING DQUINN Approved
07/03/2019 EXT METAL CLIPS/EXT SHEATHING DQUINN Approved 1. Rsp4 top of front corner of front entry post.
2. Recommend h2.5s or lags in patio roof ledger.
07/03/2019 ROOF NAILING DQUINN Approved 1. Missed 1 row of osb edge nailing right above ladder.
2. Suggest nailing roof to bird boards.
07/12/2019 GAS CLEARANCE DQUINN Approved
07/12/2019 PLUMBING - GAS PRESSURE TEST DQUINN Approved clear gas
07/12/2019 RESIDENTIAL INTERMEDIATE DQUINN Approved
07/12/2019 MECHANICAL - INTERMEDIATE DQUINN Approved
07/12/2019 PLUMBING - INTERMEDIATE DQUINN Approved
07/12/2019 FRAMING DQUINN Approved
07/18/2019 SHEET ROCK NAILING DQUINN Approved
08/13/2019 ELECTRIC - CONSTRUCTION POWER ESTEVENS Approved The TEP code is ECO.
08/26/2019 MECHANICAL - FINAL RCHANDLER Approved Note: This is a model home being used as a sales office. A separate permit will be required when this is converted to sell as an SFR.
08/26/2019 PLUMBING - FINAL RCHANDLER Approved Note: This is a model home being used as a sales office. A separate permit will be required when this is converted to sell as an SFR. -water heater is not installed, permanent water and gas are not installed.
08/26/2019 OUTDOOR LIGHTING FINAL RCHANDLER Approved Note: This is a model home being used as a sales office. A separate permit will be required when this is converted to sell as an SFR.
08/26/2019 ELECTRIC - FINAL RCHANDLER Approved Note: This is a model home being used as a sales office. A separate permit will be required when this is converted to sell as an SFR. Permanent power not connected at this time.
08/26/2019 BUILDING - FINAL RCHANDLER Approved Note: This is a model home being used as a sales office. A separate permit will be required when this is converted to sell as an SFR.
10/17/2019 TEP CLEARANCE - PM ESTEVENS Approved CODE ECO
RESEND

Documents

File Name Document Type  
None DOCUMENTS VIEW
None CONSTRPLANS VIEW