Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Address:
6002 S ZELL CT
Apply Date:
06/11/2019
Applicant:
L G I HOMES AZ CONSTRUCTION
Description:
SFR IR151518 T18-M0058
Contractors:
  • L G I HOMES AZ CONSTRUCTION

Permit Reviews

Permit Number - T19CM04170
Permit Status: Final
Permit Description: SFR IR151518 T18-M0058
Start Date Submittal Complete Date Status  
06/11/2019 RESIDENTIAL - BLDG/ZONING-WALKTHRU 06/11/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM04170
Permit Status: Final
Permit Description: SFR IR151518 T18-M0058
Total Outstanding Activity Conditions - 1
Date Name
06/11/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T19CM04170
Permit Description: SFR IR151518 T18-M0058
Total Completed Inspections - 23
Date Description Inspector Results Comments
07/22/2019 PLUMBING - ROUGH, SOIL AKLEINSORGE Approved Ok to backfill
07/22/2019 PLUMBING - YARD WTR LINE/TEST AKLEINSORGE Approved Ok to backfill
07/22/2019 PLUMBING - SEWER HCS CONNECT AKLEINSORGE Approved Ok to backfill
07/31/2019 ELECTRIC - UNDERGROUND AKLEINSORGE Approved No underground at this property
07/31/2019 ELECTRIC - UFER AKLEINSORGE Approved
07/31/2019 BUILDING PRE-SLAB AKLEINSORGE Approved Ok for concrete placement
07/31/2019 EXCAVATION/LAYOUT REBAR & ZON AKLEINSORGE Approved Fix plumbing box at front bathroom, Ok for concrete placement
08/12/2019 ROOF NAILING AKLEINSORGE Approved
08/15/2019 EXT METAL CLIPS/EXT SHEATHING AKLEINSORGE Approved All corrections complete
08/21/2019 RESIDENTIAL INTERMEDIATE MHASSAN Approved secure gas piping in attic space
08/21/2019 TEP CLEARANCE - PM MHASSAN Approved CODE ECO
08/21/2019 ELECTRIC - CONSTRUCTION POWER MHASSAN Approved OK to clear electric ECO
08/21/2019 PLUMBING - GAS PRESSURE TEST MHASSAN Approved
08/21/2019 MECHANICAL - INTERMEDIATE MHASSAN Approved
08/21/2019 PLUMBING - INTERMEDIATE MHASSAN Approved
08/21/2019 FRAMING MHASSAN Approved
08/28/2019 SHEET ROCK NAILING AKLEINSORGE Approved
10/09/2019 GAS CLEARANCE AQUIROZ Approved
10/09/2019 MECHANICAL - FINAL AQUIROZ Approved
10/09/2019 PLUMBING - FINAL AQUIROZ Approved Clear gas.
10/09/2019 OUTDOOR LIGHTING FINAL AQUIROZ Approved
10/09/2019 ELECTRIC - FINAL AQUIROZ Approved
10/15/2019 BUILDING - FINAL BSTEVENS Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW
FINAL DOCS T19CM04170.PDF DOCUMENTS VIEW
AIR BALANCE T19CM04170.PDF DOCUMENTS VIEW
INSULATION CERTIFICATE T19CM04170.PDF DOCUMENTS VIEW
None CONSTRPLANS VIEW