Permit: T19CM03791
Permit Details
Status:
Final
Type:
COMMERCIAL OTHER
Address:
3019 N BALBOA AV #01
Address NEW:
3019 N BALBOA AV #01
Apply Date:
05/29/2019
Applicant:
T V A C L L C
Description:
GAS REPIPE
Contractors:
- T V A C L L C
Permit Reviews
Permit Number - T19CM03791
Permit Status: Final
Permit Description: GAS REPIPE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/29/2019 | WALK THRU - COMM | 05/29/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM03791
Permit Status: Final
Permit Description: GAS REPIPE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/29/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM03791
Permit Description: GAS REPIPE
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2019 | GAS CLEARANCE | TVALENCIA | Approved | |
| 06/04/2019 | PLUMBING - FINAL | TVALENCIA | Approved | Clear gas meter Verbal clearance called in at 3:10pm |
| 06/04/2019 | PLUMBING - GAS PRESSURE TEST | TVALENCIA | Approved | Clear gas meter Verbal clearance called in at 3:10pm |
| 06/04/2019 | PLUMBING - FINAL | TVALENCIA | Approved | 1- Shall provide a gas bond on the system. 2- Shall remove water water flex on the water heater t & p drain and run and terminate to the outside. 3- Remove the mechanical tape around the water heater vent connector at double wall b vent. |