Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL ALTERATION
Address NEW:
3105 E VALENCIA RD
Apply Date:
05/20/2019
Applicant:
STEFANIE THRUSH
Description:
TI: MCDONALDS
Contractors:
  • RWB CONSTRUCTION & DEVELOPMENT LLC

Permit Reviews

Permit Number - T19CM03538
Permit Status: Final
Permit Description: TI: MCDONALDS
Start Date Submittal Complete Date Status  
05/20/2019 PLANS OK TO SUBMIT - COMM 05/20/2019 COMPLETED Review Details
05/20/2019 COMMERCIAL - TI 07/02/2019 COMPLETED Review Details
07/02/2019 RESUBMITTAL 07/02/2019 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T19CM03538
Permit Status: Final
Permit Description: TI: MCDONALDS
Total Outstanding Activity Conditions - 1
Date Name
05/20/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T19CM03538
Permit Description: TI: MCDONALDS
Total Completed Inspections - 29
Date Description Inspector Results Comments
08/07/2019 EXCAVATION/LAYOUT REBAR & ZON AKLEINSORGE Approved Footings for menu signs at both drive thru lanes, ok for concrete placement
08/23/2019 STEM WALL/RETAINING WALL TVALENCIA Approved
08/28/2019 PLUMBING - ABOVE CEILING MHASSAN Approved copper piping OK. ABS piping still needs to be under test and needs all the correct nail plates installed.
08/30/2019 MECHANICAL - HOODS DMUNIZ Approved Hood Smoke test for New Fryer passed. Fire wrap installed, two wraps over lapped and banded.
08/30/2019 PLUMBING - INTERMEDIATE DMUNIZ Approved Plumbing in Restroom walls Ok.
09/06/2019 ELECTRIC - ABOVE CEILING TVALENCIA Approved
09/06/2019 MECHANICAL - ABOVE CEILING TVALENCIA Approved
09/06/2019 FRAMING TVALENCIA Approved
09/06/2019 ROOF NAILING TVALENCIA Approved
09/19/2019 PLUMBING - FINAL TVALENCIA Approved
09/19/2019 OUTDOOR LIGHTING FINAL TVALENCIA Approved
09/19/2019 ELECTRIC - FINAL TVALENCIA Approved
09/19/2019 BUILDING - FINAL TVALENCIA Approved Bldg. Final okay pending Air Balance report approval and Engineering approval
09/20/2019 SIGN - FINAL BBENEDON Approved Could not locate plans or permits. Safari cannot open the page. Is there a development package permit as well?. Repairs as the work has been done within the parking area and drive-through I believe no previous engineer inspector for me to date.
Please reschedule the inspection and provide city approved plans at the time of inspection.
09/20/2019 LANDSCAPE - FINAL BBENEDON Approved Could not locate plans or permits. Safari cannot open the page. Is there a development package permit as well?. Repairs as the work has been done within the parking area and drive-through I believe no previous engineer inspector for me to date.
Please reschedule the inspection and provide city approved plans at the time of inspection.
09/20/2019 ENGINEERING - FINAL BBENEDON Approved Could not locate plans or permits. Safari cannot open the page. Is there a development package permit as well?. Repairs as the work has been done within the parking area and drive-through I believe no previous engineer inspector for me to date.
Please reschedule the inspection and provide city approved plans at the time of inspection.
09/20/2019 MECHANICAL - FINAL TVALENCIA Approved Pending Air Balance report approval.
05/27/2020 FIRE - KITCHEN EXH HOOD FINAL jfordney Approved Approved by M. Ross 9/2019
05/28/2020 MECHANICAL - INTERMEDIATE TVALENCIA Approved
05/28/2020 PLUMBING - ROUGH, SOIL TVALENCIA Approved
05/28/2020 ELECTRIC - OUTDOOR LIGHTING TVALENCIA Approved
05/28/2020 ELECTRIC - INTERMEDIATE TVALENCIA Approved
05/28/2020 ELECTRIC - UNDERGROUND TVALENCIA Approved
05/28/2020 SHEET ROCK NAILING TVALENCIA Approved
05/28/2020 U VALUE FOR WINDOW TVALENCIA Approved
05/28/2020 STUCCO MESH TVALENCIA Approved
05/28/2020 EXT METAL CLIPS/EXT SHEATHING TVALENCIA Approved
06/09/2020 FIRE - FINAL jfordney Approved
07/16/2020 HEALTH DEPT - FINAL 724-7908 BSTEVENS Approved

Documents

File Name Document Type  
FINAL HEALTH INSPECTION.PDF DOCUMENTS VIEW
001_A0.1.TIF CONSTRPLANS VIEW
002_A0.2.TIF CONSTRPLANS VIEW
003_A0.2A.TIF CONSTRPLANS VIEW
004_A0.3.TIF CONSTRPLANS VIEW
005_A0.3A.TIF CONSTRPLANS VIEW
006_A0.4.TIF CONSTRPLANS VIEW
007_D1.0.TIF CONSTRPLANS VIEW
008_D1.1.TIF CONSTRPLANS VIEW
009_D1.2.TIF CONSTRPLANS VIEW
010_SP-1.TIF CONSTRPLANS VIEW
011_SP-2.TIF CONSTRPLANS VIEW
012_SD-1.TIF CONSTRPLANS VIEW
013_A1.0.TIF CONSTRPLANS VIEW
014_A1.0A.TIF CONSTRPLANS VIEW
015_A1.0B.TIF CONSTRPLANS VIEW
016_A1.1.TIF CONSTRPLANS VIEW
017_A1.2.TIF CONSTRPLANS VIEW
018_A2.0.TIF CONSTRPLANS VIEW
019_A2.1.TIF CONSTRPLANS VIEW
020_A3.0.TIF CONSTRPLANS VIEW
021_A3.1.TIF CONSTRPLANS VIEW
022_A3.2.TIF CONSTRPLANS VIEW
023_A4.0.TIF CONSTRPLANS VIEW
024_A4.1.TIF CONSTRPLANS VIEW
025_A4.2.TIF CONSTRPLANS VIEW
026_A4.3.TIF CONSTRPLANS VIEW
027_S1.0.TIF CONSTRPLANS VIEW
028_S2.0.TIF CONSTRPLANS VIEW
029_S2.1.TIF CONSTRPLANS VIEW
030_S3.0.TIF CONSTRPLANS VIEW
031_S3.1.TIF CONSTRPLANS VIEW
032_S3.2.TIF CONSTRPLANS VIEW
033_S4.0.TIF CONSTRPLANS VIEW
034_S5.0.TIF CONSTRPLANS VIEW
035_S6.0.TIF CONSTRPLANS VIEW
036_S6.1.TIF CONSTRPLANS VIEW
037_M1.0.TIF CONSTRPLANS VIEW
038_M2.0.TIF CONSTRPLANS VIEW
039_M3.0.TIF CONSTRPLANS VIEW
040_P1.0.TIF CONSTRPLANS VIEW
041_P2.0.TIF CONSTRPLANS VIEW
042_P3.0.TIF CONSTRPLANS VIEW
043_E1.0.TIF CONSTRPLANS VIEW
044_E2.0.TIF CONSTRPLANS VIEW
045_E2.1.TIF CONSTRPLANS VIEW
046_E2.2.TIF CONSTRPLANS VIEW
047_E3.0.TIF CONSTRPLANS VIEW
048_E4.0.TIF CONSTRPLANS VIEW
049_E5.0.TIF CONSTRPLANS VIEW
050_E6.0.TIF CONSTRPLANS VIEW
051_E7.0.TIF CONSTRPLANS VIEW
052_K-1A.TIF CONSTRPLANS VIEW
053_K-2A.TIF CONSTRPLANS VIEW
054_K-3A.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW
T19CM03538 AIR BALANCE.PDF DOCUMENTS VIEW