Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19CM03426
Permit Details
Status:
Final
Type:
SINGLE FAMILY ALTERATION
Address:
709 N ARIZONA AV
Address NEW:
709 N ARIZONA AV
Apply Date:
05/14/2019
Applicant:
N/A
Description:
RECONSTRUCTION - DEMOING ROOM, AND REPLACING WITH KITCHEN ADDING BATHROOM
Contractors:
- WALKER'S ENTERPRISES INC
Permit Reviews
Permit Number - T19CM03426
Permit Status: Final
Permit Description: RECONSTRUCTION - DEMOING ROOM, AND REPLACING WITH KITCHEN ADDING BATHROOM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/14/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 07/23/2019 | COMPLETED |
| 07/23/2019 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 07/23/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM03426
Permit Status: Final
Permit Description: RECONSTRUCTION - DEMOING ROOM, AND REPLACING WITH KITCHEN ADDING BATHROOM
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/14/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM03426
Permit Description: RECONSTRUCTION - DEMOING ROOM, AND REPLACING WITH KITCHEN ADDING BATHROOM
Total Completed Inspections - 24
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2019 | ELECTRIC - UNDERGROUND | JBURGE | Approved | Ok to cover |
| 10/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | Ok to place concrete. |
| 10/17/2019 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | Ok to cover progress area. |
| 10/18/2019 | REINFORCED MASONRY PRE-GROUT | BSTEVENS | Approved | |
| 10/18/2019 | STEM WALL/RETAINING WALL | BSTEVENS | Approved | |
| 11/05/2019 | BUILDING PRE-SLAB | DQUINN | Approved | |
| 11/14/2019 | ROOF NAILING | ESTEVENS | Approved | |
| 11/14/2019 | EXT METAL CLIPS/EXT SHEATHING | ESTEVENS | Approved | |
| 11/14/2019 | FRAMING | ESTEVENS | Approved | |
| 12/12/2019 | RESIDENTIAL INTERMEDIATE | DQUINN | Approved | All ok except: 1. Bang plate both condensate lines where needed. 2. Nail protect both sides of dryer vent at top, and dryer wire. 3. Firestop wood chase between kitchen and living room, where 3 gang switch box is. Suggest rock wool to fill large void. |
| 01/22/2020 | PLUMBING - SEWER HCS CONNECT | ESTEVENS | Approved | |
| 01/22/2020 | PLUMBING - INTERMEDIATE | ESTEVENS | Approved | |
| 01/22/2020 | MECHANICAL - INTERMEDIATE | ESTEVENS | Approved | |
| 03/17/2020 | TEP CLEARANCE - PM | DQUINN | Approved | CODE ECO |
| 03/17/2020 | MECHANICAL - FINAL | DQUINN | Approved | |
| 03/17/2020 | PLUMBING - FINAL | DQUINN | Approved | |
| 04/20/2020 | OUTDOOR LIGHTING FINAL | TVALENCIA | Approved | |
| 04/20/2020 | ELECTRIC - FINAL | TVALENCIA | Approved | |
| 04/23/2020 | LANDSCAPE - FINAL | JBURGE | Approved | |
| 04/23/2020 | NPPO - FINAL | JBURGE | Approved | |
| 04/23/2020 | RIGHT OF WAY - FINAL | JBURGE | Approved | |
| 04/23/2020 | BUILDING - FINAL | JBURGE | Approved | |
| 04/23/2020 | ENGINEERING - FINAL | BBENEDON | Approved | |
| 04/23/2020 | FIRE - FINAL | jfordney | Approved |