Permit: T19CM03061
Permit Details
Apply Date:
04/30/2019
Applicant:
Description:
SFR DRHT308018 T18-M0052
Permit Reviews
Permit Number - T19CM03061
Permit Status: Expired
Permit Description: SFR DRHT308018 T18-M0052
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/30/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 04/30/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM03061
Permit Status: Expired
Permit Description: SFR DRHT308018 T18-M0052
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/30/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
04/30/2019 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
04/30/2019 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/30/2019 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM03061
Permit Description: SFR DRHT308018 T18-M0052
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/16/2019 | COT - RSPL - Yard Water Line | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } | |
05/16/2019 | COT - RSPL - Sewer | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } | |
05/16/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } | |
05/22/2019 | COT - RSBU - Preslab | Passed | {Activity date: 05/22/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - make sure special inspector is OK with post tension cables, there appears to be some issues with exposed cabling that may need to be addressed before your pour. Also make sure to have site plan on site included with your drawings or may result in a failed inspection as we need to verify setbacks.} ; {Activity date: 05/20/2019; Status: Not ready for Inspection; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Contractor called and cancelled the inspection request.} | |
05/22/2019 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 05/22/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - clean debris out of footings and make sure to maintain clearances around rebar.} ; {Activity date: 05/20/2019; Status: Not ready for Inspection; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Contractor called and cancelled the inspection request.} | |
06/04/2019 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 06/04/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - many shiners especially upstairs shear walls, re-nail where loose.} | |
06/11/2019 | COT - RSBU - Roof Nailing | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 06/04/2019; Status: Not ready for Inspection; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - please provide truss calx for upstairs. Only floor joist calx on site which those were checked. Please provide a secured ladder to inspect roof nailing.} | |
06/19/2019 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/19/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/22/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - rebar installed} | |
06/19/2019 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 06/19/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - CODE ECO} | |
06/19/2019 | COT - RSEL - Construction Power | Passed | {Activity date: 06/19/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - ECO} | |
06/27/2019 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 06/27/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } | |
06/28/2019 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 06/28/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - TJI floor joists are coming from Boise Cascade With 12" round notches throughout Per engineer Steve Di Antonio with Boise Cascade} ; {Activity date: 06/27/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - Provide engineer fix for over notching TJI floor joists throughout } |
|
06/28/2019 | COT - LCBU - Framing | Passed | {Activity date: 06/28/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - TJI floor joists are coming from Boise Cascade With 12" round notches throughout Per engineer Steve Di Antonio with Boise Cascade} ; {Activity date: 06/27/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - Provide engineer fix for over notching TJI floor joists throughout } ; {Activity date: 06/04/2019; Status: Not ready for Inspection; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - please call this in with completion of intermediates} |
|
06/28/2019 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 06/28/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - TJI floor joists are coming from Boise Cascade With 12" round notches throughout Per engineer Steve Di Antonio with Boise Cascade} ; {Activity date: 06/27/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - DWV system ok no test potable water } |
|
06/28/2019 | RSME - Mechanical Progress | Passed | {Activity date: 06/28/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - TJI floor joists are coming from Boise Cascade With 12" round notches throughout Per engineer Steve Di Antonio with Boise Cascade} | |
07/09/2019 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 07/09/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } | |
08/14/2019 | COT - BULD - SWG Clearance | Passed | {Activity date: 08/14/2019; Status: Approved; Inspector: AQUIROZ; Comment: Entered by DMERANZ1 - } | |
08/20/2019 | COT - RSME - Mechanical Final | Passed | {Activity date: 08/20/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } | |
08/20/2019 | COT - RSEL - Outdoor Lighting | Passed | {Activity date: 08/20/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } | |
08/20/2019 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/20/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } | |
08/20/2019 | COT - RSEL - Electrical Final | Passed | {Activity date: 08/20/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } | |
08/21/2019 | RSBU - Building Final | Passed | {Activity date: 08/21/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/20/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } | |
08/21/2019 | COT - RSPL - Plumbing Final | Passed | {Activity date: 08/21/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/20/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide a water hammer arrestor for the dishwasher supply. 2- Clean out for the Washing Machine incomplete. 2- Missing electric outlet trim plate 2nd floor} ; {Activity date: 04/30/2019; Status: Prior to Final Inspectn; Inspector: PMARTIN1; Comment: Entered by PMARTIN1 - ISSUED WITH PCRWRD CONDITIONS: NO PHYSICAL CONNECTION TO THE PUBLIC SEWER SYSTEM UNTIL THE PUBLIC SEWER G-2016-041 IS ACCEPTED AND RELEASED BY PCRWRD NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2016-041 IS ACCEPTED AND RELEASED BY PCRWRD} |
|
08/21/2019 | RSPL - Plumbing Progress | Passed | {Activity date: 08/21/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } |