Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Apply Date:
04/30/2019
Applicant:
Description:
SFR DRHT308018 T18-M0052

Permit Reviews

Permit Number - T19CM03061
Permit Status: Expired
Permit Description: SFR DRHT308018 T18-M0052
Start Date Submittal Complete Date Status  
04/30/2019 RESIDENTIAL - BLDG/ZONING-WALKTHRU 04/30/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM03061
Permit Status: Expired
Permit Description: SFR DRHT308018 T18-M0052
Total Outstanding Activity Conditions - 4
Date Name
04/30/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/30/2019 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/30/2019 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/30/2019 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Completed Inspections

Permit Status: Expired
Permit Number: T19CM03061
Permit Description: SFR DRHT308018 T18-M0052
Total Completed Inspections - 24
Date Description Inspector Results Comments
05/16/2019 COT - RSPL - Yard Water Line Passed {Activity date: 05/16/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - }
05/16/2019 COT - RSPL - Sewer Passed {Activity date: 05/16/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - }
05/16/2019 COT - RSPL - Rough Soil Passed {Activity date: 05/16/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - }
05/22/2019 COT - RSBU - Preslab Passed {Activity date: 05/22/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - make sure special inspector is OK with post tension cables, there appears to be some issues with exposed cabling that may need to be addressed before your pour. Also make sure to have site plan on site included with your drawings or may result in a failed inspection as we need to verify setbacks.} ; {Activity date: 05/20/2019; Status: Not ready for Inspection; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Contractor called and cancelled the inspection request.}
05/22/2019 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/22/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - clean debris out of footings and make sure to maintain clearances around rebar.} ; {Activity date: 05/20/2019; Status: Not ready for Inspection; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Contractor called and cancelled the inspection request.}
06/04/2019 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 06/04/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - many shiners especially upstairs shear walls, re-nail where loose.}
06/11/2019 COT - RSBU - Roof Nailing Passed {Activity date: 06/11/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 06/04/2019; Status: Not ready for Inspection; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - please provide truss calx for upstairs. Only floor joist calx on site which those were checked. Please provide a secured ladder to inspect roof nailing.}
06/19/2019 COT - RSEL - Grounding/Bonding Passed {Activity date: 06/19/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/22/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - rebar installed}
06/19/2019 PDSD Building Division - TEP PM Clearance Passed {Activity date: 06/19/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - CODE ECO}
06/19/2019 COT - RSEL - Construction Power Passed {Activity date: 06/19/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - ECO}
06/27/2019 COT - RSPL - Gas Pressure Test Passed {Activity date: 06/27/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - }
06/28/2019 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 06/28/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - TJI floor joists are coming from Boise Cascade With 12" round notches throughout Per engineer Steve Di Antonio with Boise Cascade} ; {Activity date: 06/27/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - Provide engineer fix for over notching TJI floor joists throughout
}
06/28/2019 COT - LCBU - Framing Passed {Activity date: 06/28/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - TJI floor joists are coming from Boise Cascade With 12" round notches throughout Per engineer Steve Di Antonio with Boise Cascade} ; {Activity date: 06/27/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - Provide engineer fix for over notching TJI floor joists throughout
} ; {Activity date: 06/04/2019; Status: Not ready for Inspection; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - please call this in with completion of intermediates}
06/28/2019 COT - LCPL - Plumbing Intermediate Passed {Activity date: 06/28/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - TJI floor joists are coming from Boise Cascade With 12" round notches throughout Per engineer Steve Di Antonio with Boise Cascade} ; {Activity date: 06/27/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - DWV system ok no test potable water
}
06/28/2019 RSME - Mechanical Progress Passed {Activity date: 06/28/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - TJI floor joists are coming from Boise Cascade With 12" round notches throughout Per engineer Steve Di Antonio with Boise Cascade}
07/09/2019 COT - HCBU - Interior Shear Bracing Passed {Activity date: 07/09/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - }
08/14/2019 COT - BULD - SWG Clearance Passed {Activity date: 08/14/2019; Status: Approved; Inspector: AQUIROZ; Comment: Entered by DMERANZ1 - }
08/20/2019 COT - RSME - Mechanical Final Passed {Activity date: 08/20/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - }
08/20/2019 COT - RSEL - Outdoor Lighting Passed {Activity date: 08/20/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - }
08/20/2019 COT - RSEL - Electrical Underground Passed {Activity date: 08/20/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - }
08/20/2019 COT - RSEL - Electrical Final Passed {Activity date: 08/20/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - }
08/21/2019 RSBU - Building Final Passed {Activity date: 08/21/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/20/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - }
08/21/2019 COT - RSPL - Plumbing Final Passed {Activity date: 08/21/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/20/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide a water hammer arrestor for the dishwasher supply.
2- Clean out for the Washing Machine incomplete.
2- Missing electric outlet trim plate 2nd floor} ; {Activity date: 04/30/2019; Status: Prior to Final Inspectn; Inspector: PMARTIN1; Comment: Entered by PMARTIN1 - ISSUED WITH PCRWRD CONDITIONS:

NO PHYSICAL CONNECTION TO THE PUBLIC SEWER SYSTEM UNTIL THE PUBLIC SEWER G-2016-041 IS ACCEPTED AND RELEASED BY PCRWRD

NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2016-041 IS ACCEPTED AND RELEASED BY PCRWRD}
08/21/2019 RSPL - Plumbing Progress Passed {Activity date: 08/21/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - }

Documents

File Name Document Type  
None CONSTRPLANS VIEW
None DOCUMENTS VIEW