Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Address NEW:
2558 E MONTE VISTA DR
Apply Date:
04/04/2019
Applicant:
Description:
FRONT ADDITION; PORCH AND REPLACE CARPORT

Permit Reviews

Permit Number - T19CM02359
Permit Status: Expired
Permit Description: FRONT ADDITION; PORCH AND REPLACE CARPORT
Start Date Submittal Complete Date Status  
04/04/2019 RESIDENTIAL - BLDG/ZONING-WALKTHRU 06/14/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM02359
Permit Status: Expired
Permit Description: FRONT ADDITION; PORCH AND REPLACE CARPORT
Total Outstanding Activity Conditions - 1
Date Name
04/04/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Expired
Permit Number: T19CM02359
Permite Description: FRONT ADDITION; PORCH AND REPLACE CARPORT
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/04/2022 RSBU - Building Final N/A Canceled Inspection Canceled
11/04/2022 COT - RSEL - Outdoor Lighting N/A Canceled Inspection Canceled
11/04/2022 COT - RSPL - Plumbing Final N/A Canceled Inspection Canceled
11/04/2022 COT - RSEL - Electrical Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Expired
Permit Number: T19CM02359
Permit Description: FRONT ADDITION; PORCH AND REPLACE CARPORT
Total Completed Inspections - 12
Date Description Inspector Results Comments
07/10/2019 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 07/10/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Note: Pad footing added to support beam on Northeast corner.}
08/01/2019 COT - RSPL - Rough Soil Passed {Activity date: 08/01/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/29/2019; Status: Correction Required; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Plumbing is not per approved plans.}
08/07/2019 COT - RSBU - Preslab Passed {Activity date: 08/07/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Front room ok to pour
}
11/25/2019 COT - RSBU - Roof Nailing Passed {Activity date: 11/25/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - } ; {Activity date: 11/19/2019; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Finish nailing off roof where missed.
Correct less than 12” strip of plywood.
Kerf plywood for 1/8th in spacing.
Correct and add rafter and tji clips.
Uncover roof completely for re-inspection.}
11/25/2019 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 11/25/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - }
04/20/2020 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 04/20/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - }
04/20/2020 COT - RSME - Mechanical Final Passed {Activity date: 04/20/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - CODE}
04/20/2020 COT - LCBU - Framing Passed {Activity date: 04/20/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - } ; {Activity date: 11/19/2019; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Frame doesn’t get inspected until intermediates are in place.}
04/20/2020 COT - RSBU - Stem Wall/Retaining Wall Passed {Activity date: 04/20/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - } ; {Activity date: 07/24/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Stem wall for main addition only; columns and more lifts remain to be inspected.}
04/20/2020 COT - BULD - SWG Clearance Passed {Activity date: 04/20/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - CODE}
04/20/2020 COT - RSPL - Gas Pressure Test Passed {Activity date: 04/20/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - }
04/20/2020 COT - RSBU - Masonry Pregrout Passed {Activity date: 04/20/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - } ; {Activity date: 08/26/2019; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - 2 nd lift. 4’ to 8’.} ; {Activity date: 08/15/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by DMERANZ1 - 1st lift of n, w, e walls ok to grout.

Inspector could not be there at 12N as requested due to heavy work load and routing.}

Documents

File Name Document Type  
001_SHT. 1 OF 8.TIF CONSTRPLANS VIEW
002_SHT. 2 OF 8.TIF CONSTRPLANS VIEW
003_SHT. 3 OF 8.TIF CONSTRPLANS VIEW
004_SHT. 4 OF 8.TIF CONSTRPLANS VIEW
005_SHT. 5 OF 8.TIF CONSTRPLANS VIEW
006_SHT. 6 OF 8.TIF CONSTRPLANS VIEW
007_SHT. 7 OF 8.TIF CONSTRPLANS VIEW
008_SHT. 8 OF 8.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW