Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19CM02272
Permit Details
Apply Date:
04/02/2019
Applicant:
L G I HOMES AZ CONSTRUCTION
Description:
SFR MES184518 T18-M0060
Contractors:
- L G I HOMES AZ CONSTRUCTION
Permit Reviews
Permit Number - T19CM02272
Permit Status: Final
Permit Description: SFR MES184518 T18-M0060
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/02/2019 | RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU | 04/02/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM02272
Permit Status: Final
Permit Description: SFR MES184518 T18-M0060
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/02/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM02272
Permit Description: SFR MES184518 T18-M0060
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2019 | PLUMBING - SEWER HCS CONNECT | AKLEINSORGE | Approved | Ok to backfill |
05/09/2019 | PLUMBING - YARD WTR LINE/TEST | AKLEINSORGE | Approved | |
05/09/2019 | PLUMBING - ROUGH, SOIL | AKLEINSORGE | Approved | |
05/15/2019 | ELECTRIC - UNDERGROUND | DQUINN | Approved | |
05/15/2019 | ELECTRIC - UFER | DQUINN | Approved | |
05/15/2019 | BUILDING PRE-SLAB | DQUINN | Approved | |
05/15/2019 | EXCAVATION/LAYOUT REBAR & ZON | DQUINN | Approved | |
05/28/2019 | TEP CLEARANCE - AM | AKELINSORGE | Approved | CODE ECO |
05/28/2019 | ELECTRIC - CONSTRUCTION POWER | AKELINSORGE | Approved | Clear eco |
05/28/2019 | ROOF NAILING | AKELINSORGE | Approved | |
05/28/2019 | EXT METAL CLIPS/EXT SHEATHING | AKELINSORGE | Approved | |
06/13/2019 | MECHANICAL - INTERMEDIATE | AKLEINSORGE | Approved | |
06/13/2019 | PLUMBING - GAS PRESSURE TEST | AKLEINSORGE | Approved | |
06/13/2019 | RESIDENTIAL INTERMEDIATE | AKLEINSORGE | Approved | |
06/13/2019 | FRAMING | AKLEINSORGE | Approved | |
06/20/2019 | SHEET ROCK NAILING | MHASSAN | Approved | |
07/22/2019 | GAS CLEARANCE | AKLEINSORGE | Approved | |
07/24/2019 | MECHANICAL - FINAL | AKLEINSORGE | Approved | 1. Install rain proof caps on water heater and dryer vents on roof 2. Install exhaust fan in master bathroom 3. Adjust exhaust fan in 1/2 bathroom, running very loud |
07/24/2019 | PLUMBING - FINAL | AKLEINSORGE | Approved | |
07/24/2019 | PLUMBING - PROGRESS | AKLEINSORGE | Approved | |
07/24/2019 | OUTDOOR LIGHTING FINAL | AKLEINSORGE | Approved | |
07/24/2019 | ELECTRIC - FINAL | AKLEINSORGE | Approved | 1. Label panel for non metallic plumbing and PT slab |
07/24/2019 | BUILDING - FINAL | AKLEINSORGE | Approved | 1. PT tag on water riser 2. Pour concrete stoop at rear sliding door 3. Install address numbers |