Permit: T19CM02039
Permit Details
Apply Date:
03/21/2019
Applicant:
TITAN SOLAR POWER ***APA***
Description:
E Install residential rooftop solar, 6.600 KW DC system/MPU, 22 modules, LIKE FOR LIKE.
Permit Reviews
Permit Number - T19CM02039
Permit Status: Final
Permit Description: E Install residential rooftop solar, 6.600 KW DC system/MPU, 22 modules, LIKE FOR LIKE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2019 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 04/01/2019 | COMPLETED |
| 03/21/2019 | REVISION - - 1ST | 04/22/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM02039
Permit Status: Final
Permit Description: E Install residential rooftop solar, 6.600 KW DC system/MPU, 22 modules, LIKE FOR LIKE.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/21/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 03/21/2019 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Completed Inspections
Permit Status: Final
Permit Number: T19CM02039
Permit Description: E Install residential rooftop solar, 6.600 KW DC system/MPU, 22 modules, LIKE FOR LIKE.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2019 | ELECTRIC - SERVICE UPGRADE | GWEST | Approved | 2 Rods, GEC, Water Bond at front door hose Bibb, and Gas Bond all in place. TEP was called for Clearance, spoke to Roman, INCR |
| 05/20/2019 | ELECTRIC - PROGRESS | DQUINN | Approved | APPROVED UPON APPROVAL OF 2090 |
| 05/20/2019 | TEP CLEARANCE - PM | DQUINN | Approved | CODE DGC |
| 05/20/2019 | ELECTRIC - FINAL | DQUINN | Approved | Clear dgc |
| 05/20/2019 | BUILDING - FINAL | DQUINN | Approved |