Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19CM01356
Permit Details
Status:
Expired
Type:
Residential Building - One or Two Family
Address:
3483 E TERRA ALTA BL
Address NEW:
3483 E TERRA ALTA BL
Apply Date:
02/25/2019
Applicant:
Leticia Luna
Description:
REBUILD SFR AFTER FIRE DAMAGE
Permit Reviews
Permit Number - T19CM01356
Permit Status: Expired
Permit Description: REBUILD SFR AFTER FIRE DAMAGE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/25/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 02/25/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM01356
Permit Status: Expired
Permit Description: REBUILD SFR AFTER FIRE DAMAGE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/25/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T19CM01356
Permit Status: Expired
Permit Description: REBUILD SFR AFTER FIRE DAMAGE
| Date | Description | Comments |
|---|---|---|
| 02/25/2019 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Outstanding Inspections
Permit Status: Expired
Permit Number: T19CM01356
Permite Description: REBUILD SFR AFTER FIRE DAMAGE
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - RSME - Mechanical Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSPL - Plumbing Final | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSEL - Electrical Final | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | RSBU - Building Final | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - RSEL - Service Upgrade | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | RSME - Mechanical Progress | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - RSPL - Gas Pressure Test | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM01356
Permit Description: REBUILD SFR AFTER FIRE DAMAGE
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2019 | COT - RSBU - Preslab | Passed | {Activity date: 04/05/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by CBELL1 - } | |
| 04/05/2019 | COT - RSBU - Stem Wall/Retaining Wall | Passed | {Activity date: 04/05/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by CBELL1 - } | |
| 04/05/2019 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 04/05/2019; Status: Approved; Inspector: RCHANDLER; Comment: Entered by CBELL1 - } | |
| 04/16/2019 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 04/16/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CMURPHY1 - Code RECN. clear rec} | |
| 04/16/2019 | COT - RSEL - Construction Power | Passed | {Activity date: 04/16/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CMURPHY1 - Panel ok. Need a 20 amp gfi at bottom of panel. Clear rec} ; {Activity date: 04/12/2019; Status: Correction Required; Inspector: RCHANDLER; Comment: Entered by CBELL1 - 1-Install powers receptacle(s) to Code.} |
|
| 04/19/2019 | BULD - Electrical Clearance | Passed | {Activity date: 04/19/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - CODE INCR} | |
| 05/29/2019 | COT - RSBU - Roof Nailing | Passed | {Activity date: 05/29/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - } | |
| 05/29/2019 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 05/29/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - } | |
| 09/23/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/23/2019; Status: Approved; Inspector: BSTEVENS; Comment: Entered by BSTEVENS - } ; {Activity date: 09/17/2019; Status: Correction Required; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Previous corrections not completed.} ; {Activity date: 09/16/2019; Status: Correction Required; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - 1--No test on DWV piping. 2--Provide bell hole for inspection at all joints to allow for 360 degree inspection. Note: If this inspection is not approved next time, a re-inspection fee will be assessed. Note: This inspection is a good candidate for remote inspection.} |
|
| 03/06/2020 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 03/06/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/24/2020; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Provide minimum 1 inch clearance at flue pipe to combustibles at water heater. Provide fire stop at all plate penetrations. Line set insulation not properly installed.} ; {Activity date: 12/23/2019; Status: Correction Required; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - } | |
| 03/06/2020 | COT - LCBU - Framing | Passed | {Activity date: 03/06/2020; Status: Approved; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/24/2020; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Drywall screws not to be used as structural components (truss repair). Provide fire blocking and fire stop at furred out walls. Provide fire stop at all top plate penetrations.} ; {Activity date: 12/23/2019; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - Provide approved truss drawings, including repairs for cut truss and associated headering.} ; {Activity date: 05/03/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by CBELL1 - Spoke with contractor trust is not installed yet} |