Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Apply Date:
02/20/2019
Applicant:
Description:
SFR LEN400418 T18-M0080

Permit Reviews

Permit Number - T19CM01253
Permit Status: Expired
Permit Description: SFR LEN400418 T18-M0080
Start Date Submittal Complete Date Status  
02/20/2019 RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU 02/20/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM01253
Permit Status: Expired
Permit Description: SFR LEN400418 T18-M0080
Total Outstanding Activity Conditions - 4
Date Name
02/20/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/20/2019 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
02/20/2019 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/20/2019 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Completed Inspections

Permit Status: Expired
Permit Number: T19CM01253
Permit Description: SFR LEN400418 T18-M0080
Total Completed Inspections - 23
Date Description Inspector Results Comments
03/18/2019 COT - RSPL - Yard Water Line Passed {Activity date: 03/18/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by CBELL1 - }
03/18/2019 COT - RSPL - Rough Soil Passed {Activity date: 03/18/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by CBELL1 - }
03/22/2019 COT - RSPL - Sewer Passed {Activity date: 03/22/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by CBELL1 - } ; {Activity date: 03/18/2019; Status: Denied; Inspector: DMUNIZ; Comment: Entered by CBELL1 - NO HCS CONNECTION}
03/27/2019 COT - RSEL - Grounding/Bonding Passed {Activity date: 03/27/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by CBELL1 - }
03/27/2019 COT - RSBU - Preslab Passed {Activity date: 03/27/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by CBELL1 - }
03/27/2019 COT - RSEL - Electrical Underground Passed {Activity date: 03/27/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by CBELL1 - }
03/27/2019 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 03/27/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by CBELL1 - }
04/09/2019 COT - RSBU - Roof Nailing Passed {Activity date: 04/09/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by CBELL1 - }
04/09/2019 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 04/09/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by CBELL1 - }
05/15/2019 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 05/15/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - }
05/15/2019 COT - RSPL - Gas Pressure Test Passed {Activity date: 05/15/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - }
05/16/2019 COT - LCBU - Framing Passed {Activity date: 05/16/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - All corrections have been made ok to proceed.
} ; {Activity date: 05/15/2019; Status: Partial Approval; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - 1. Foam top plate penetrations on east side of entry door to garage.
}
05/16/2019 COT - LCPL - Plumbing Intermediate Passed {Activity date: 05/16/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - All corrections have been made ok to proceed.
} ; {Activity date: 05/15/2019; Status: Partial Approval; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - 1. Secure toilet flange in both bathrooms.
2. Put DWV lines under test.}
05/16/2019 RSME - Mechanical Progress Passed {Activity date: 05/16/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - All corrections have been made ok to proceed.
} ; {Activity date: 05/15/2019; Status: Partial Approval; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - 1. Install duct boot at ceiling in office and block on 3 sides.}
05/24/2019 COT - HCBU - Interior Shear Bracing Passed {Activity date: 05/24/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - }
07/08/2019 PDSD Building Division - TEP PM Clearance Passed {Activity date: 07/08/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - CODE ECO}
07/08/2019 COT - RSEL - Construction Power Passed {Activity date: 07/08/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - Clear TEP (ECO).} ; {Activity date: 06/26/2019; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - No Riser installed on Service.}
07/17/2019 COT - BULD - SWG Clearance Passed {Activity date: 07/17/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }
07/31/2019 COT - RSEL - Outdoor Lighting Passed {Activity date: 07/31/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - }
08/02/2019 COT - RSME - Mechanical Final Passed {Activity date: 08/02/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - All corrections complete
} ; {Activity date: 07/31/2019; Status: Partial Approval; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - 1. AC is over fused 35amp max, 40amp is installed
2. Need tamper proof caps on refrigerant lines} ; {Activity date: 07/17/2019; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - Gas Clearance only.}
08/02/2019 RSBU - Building Final Passed {Activity date: 08/02/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - All corrections complete
} ; {Activity date: 07/31/2019; Status: Partial Approval; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - 1. PT tag on water riser
}
08/02/2019 COT - RSPL - Plumbing Final Passed {Activity date: 08/02/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - All corrections complete
} ; {Activity date: 07/31/2019; Status: Partial Approval; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - 1. TPR drain has negative pitch, needs positive drainage
}
08/02/2019 COT - RSEL - Electrical Final Passed {Activity date: 08/02/2019; Status: Approved; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - All corrections complete
} ; {Activity date: 07/31/2019; Status: Partial Approval; Inspector: AKLEINSORGE; Comment: Entered by DMERANZ1 - 1. Secure whip from fuse box to AC unit
}

Documents

File Name Document Type  
None DOCUMENTS VIEW