Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Apply Date:
02/19/2019
Applicant:
Description:
SFR F40F18 T18-M0065

Permit Reviews

Permit Number - T19CM01213
Permit Status: Expired
Permit Description: SFR F40F18 T18-M0065
Start Date Submittal Complete Date Status  
02/19/2019 RESIDENTIAL - BLDG-MODEL PLAN/ENGINE/WALK THRU 02/20/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM01213
Permit Status: Expired
Permit Description: SFR F40F18 T18-M0065
Total Outstanding Activity Conditions - 5
Date Name
02/19/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/19/2019 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/19/2019 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/19/2019 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
02/19/2019 SPECIAL INSPECTION IS REQUIRED FOR ANCHORS CAST IN CONCRETE

Outstanding Inspections

Permit Status: Expired
Permit Number: T19CM01213
Permite Description: SFR F40F18 T18-M0065
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/31/2019 COT - RSPL - Sewer N/A Canceled {Activity date: 07/31/2019; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }
07/31/2019 COT - RSEL - Service Upgrade N/A Canceled {Activity date: 07/31/2019; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }

Completed Inspections

Permit Status: Expired
Permit Number: T19CM01213
Permit Description: SFR F40F18 T18-M0065
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/12/2019 COT - RSPL - Rough Soil Passed {Activity date: 03/12/2019; Status: Approved; Inspector: BJONES; Comment: Entered by CBELL1 - soil pipe approved}
03/19/2019 COT - RSEL - Grounding/Bonding Passed {Activity date: 03/19/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - }
03/19/2019 COT - RSBU - Preslab Passed {Activity date: 03/19/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - }
03/19/2019 COT - RSEL - Electrical Underground Passed {Activity date: 03/19/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - }
03/19/2019 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 03/19/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - }
04/03/2019 COT - RSBU - Roof Nailing Passed {Activity date: 04/03/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - } ; {Activity date: 04/02/2019; Status: Denied; Inspector: DMUNIZ; Comment: Entered by CBELL1 - Need ladder to access roof for further inspection.}
04/03/2019 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 04/03/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - } ; {Activity date: 04/02/2019; Status: Denied; Inspector: DMUNIZ; Comment: Entered by CBELL1 - Install missing clips throughout perimeter. Install wall brace SE Corner for Shearwall}
05/01/2019 COT - RSPL - Gas Pressure Test Passed {Activity date: 05/01/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - }
05/07/2019 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 05/07/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - } ; {Activity date: 05/01/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by CBELL1 - Electric denied, plumbing PA, mech denied
1. Bang plate back side of dryer vent.
2. Secure living room 4 gang.
3. Bang plate 2 wire penetrations at stove area.
4. Block pantry duct boot 3 sides.
5. Zero pressure on potable test.}
05/07/2019 COT - LCBU - Framing Passed {Activity date: 05/07/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - } ; {Activity date: 05/01/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by CBELL1 - 1. Bang plate back side of dryer vent.
2. Secure living room 4 gang.
3. Bang plate 2 wire penetrations at stove area.
4. Block pantry duct boot 3 sides.
5. Zero pressure on potable test.}
05/24/2019 COT - RSEL - Construction Power Passed {Activity date: 05/24/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - Clear eco}
05/24/2019 BULD - Electrical Clearance Passed {Activity date: 05/24/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - CODE ECO}
06/03/2019 COT - HCBU - Interior Shear Bracing Passed {Activity date: 06/03/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - }
07/18/2019 COT - LCPL - Plumbing Intermediate Passed {Activity date: 07/18/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by VFLORES1 - } ; {Activity date: 05/01/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by CBELL1 - 1. Bang plate back side of dryer vent.
2. Secure living room 4 gang.
3. Bang plate 2 wire penetrations at stove area.
4. Block pantry duct boot 3 sides.
5. Zero pressure on potable test.}
07/18/2019 COT - RSPL - Plumbing Final Passed {Activity date: 07/18/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by VFLORES1 - Clear gas} ; {Activity date: 03/04/2019; Status: Prior to Final Inspectn; Inspector: GKOZIOL; Comment: Entered by KROBLES1 - ISSUED WITH CONDITIONS: SFR - CONNECTING TO ON-SITE PRIVATE SEWER/LIFT STATION/FORCE MAIN PER PERMIT #P18WX01223/COT #T18CM04241/DEQ #P18SD00009/P18SD00022 NO CONNECTION OF THE PRIVATE SEWER TO THE PUBLIC SEWER MANHOLE #5 ON G-17-108 UNTIL THE PUBLIC SEWERS G-2017-062/G-2017-067/G-2017-108 ARE ACCEPTED AND RELEASED AND A MANHOLE TAP PERMIT HAS BEEN ISSUED BY PCRWRD - SYLVIA. QUINLAN@PIMA.GOV - 520-724-6649 ISSUED WITH PDEQ/PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE DISCHARGE AUTHORIZATIONS (D.A.'S) FOR THE PRIVATE SEWER WITH LIFT STATION & FORCE MAIN(P18SD00009/P18SD00022) AND THE DISCHARGE AUTHORIZATIONS (D. A.'S) FOR PUBLIC SEWERS G-2017-108/G-2017-067/G-2017-062 ARE ISSUED BY PDEQ NO PHYSICAL CONNECTION TO THE PUBLIC SEWER SYSTEM UNTIL THE PUBLIC SEWERS G-2017-108/G-2017-067/G-2017-062 ARE ACCEPTED AND RELEASED BY PCRWRD NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWERS G-2017-108/G-2017-067/G-2017-062 ARE ACCEPTED AND RELEASED BY PCRWRD}
07/18/2019 COT - BULD - SWG Clearance Passed {Activity date: 07/18/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by VFLORES1 - }
07/18/2019 RSME - Mechanical Progress Passed {Activity date: 07/18/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by VFLORES1 - } ; {Activity date: 05/01/2019; Status: Denied; Inspector: DQUINN; Comment: Entered by CBELL1 - 1. Bang plate back side of dryer vent.
2. Secure living room 4 gang.
3. Bang plate 2 wire penetrations at stove area.
4. Block pantry duct boot 3 sides.
5. Zero pressure on potable test.}
07/31/2019 COT - RSME - Mechanical Final Passed {Activity date: 07/31/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }
07/31/2019 RSBU - Building Final Passed {Activity date: 07/31/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }
07/31/2019 COT - RSPL - Yard Water Line Passed {Activity date: 07/31/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }
07/31/2019 COT - RSEL - Outdoor Lighting Passed {Activity date: 07/31/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }
07/31/2019 COT - RSEL - Electrical Final Passed {Activity date: 07/31/2019; Status: Approved; Inspector: DMUNIZ; Comment: Entered by DMERANZ1 - }

Documents

File Name Document Type  
None DOCUMENTS VIEW
None CONSTRPLANS VIEW