Permit: T19CM00541
Permit Details
Apply Date:
01/25/2019
Applicant:
INAI ANZUETO
Description:
ADD BEDROOM AND STORAGE SHED
Permit Reviews
Permit Number - T19CM00541
Permit Status: Expired
Permit Description: ADD BEDROOM AND STORAGE SHED
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/25/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 03/08/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM00541
Permit Status: Expired
Permit Description: ADD BEDROOM AND STORAGE SHED
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/25/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 03/08/2019 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
Outstanding Inspections
Permit Status: Expired
Permit Number: T19CM00541
Permite Description: ADD BEDROOM AND STORAGE SHED
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| MECHANICAL - FINAL | N/A | Not Inspected | ||
| 08/21/2019 | BUILDING - FINAL | N/A | Not ready for Inspection | window in bedroom does not meet code for egress. It is too high and not sized per plan. Smoke alarm needed in bedroom. Plumbing needs to be completed. |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM00541
Permit Description: ADD BEDROOM AND STORAGE SHED
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2019 | PLUMBING - GAS PRESSURE TEST | RCAMACHO | Approved | OK to clear gas to relocate meter |
| 03/25/2019 | GAS CLEARANCE | GWEST | Approved | |
| 07/29/2019 | PLUMBING - ROUGH, SOIL | AKLEINSORGE | Approved | The bathroom addition plumbing was already installed, backfilled and slab poured at time of inspection, unable to verify anything underground. The bathroom addition plumbing was already installed, backfilled and slab poured at time of inspection, unable to verify anything underground. |
| 07/29/2019 | EXCAVATION/LAYOUT REBAR & ZON | AKLEINSORGE | Approved | The addition and shed footings were already completed at time of inspection, footings were verified from pictures provided by homeowner. Note: Informed homeowner that everything he did without inspection was at his own risk. Also informed homeowner that everything needed to be installed and completed before calling in for final inspections. At that time we would check that all MEP was functioning properly. |
| 07/29/2019 | STEM WALL/RETAINING WALL | AKLEINSORGE | Approved | The addition was already completed at time of inspection, unable to verify that walls were done to plan. Note: Informed homeowner that everything he did without inspection was at his own risk. Also informed homeowner that everything needed to be installed and completed before calling in for final inspections. At that time we would check that all MEP was functioning properly. |
| 07/29/2019 | BUILDING PRE-SLAB | AKLEINSORGE | Approved | The addition and shed slabs were already completed at time of inspection, unable to verify the slabs were done to plan. Note: Informed homeowner that everything he did without inspection was at his own risk. Also informed homeowner that everything needed to be installed and completed before calling in for final inspections. At that time we would check that all MEP was functioning properly. |
| 07/29/2019 | REINFORCED MASONRY PRE-GROUT | AKLEINSORGE | Approved | The addition was already completed at time of inspection, unable to verify that walls were done to plan. Note: Informed homeowner that everything he did without inspection was at his own risk. Also informed homeowner that everything needed to be installed and completed before calling in for final inspections. At that time we would check that all MEP was functioning properly. |
| 07/29/2019 | EXT METAL CLIPS/EXT SHEATHING | AKLEINSORGE | Approved | The addition and shed was already completed at time of inspection, unable to verify that walls were done to plan. Note: Informed homeowner that everything he did without inspection was at his own risk. Also informed homeowner that everything needed to be installed and completed before calling in for final inspections. At that time we would check that all MEP was functioning properly. |
| 07/29/2019 | ROOF NAILING | AKLEINSORGE | Approved | The addition and shed was already completed at time of inspection, unable to verify that roofs were done to plan. Note: Informed homeowner that everything he did without inspection was at his own risk. Also informed homeowner that everything needed to be installed and completed before calling in for final inspections. At that time we would check that all MEP was functioning properly. |
| 07/29/2019 | FRAMING | AKLEINSORGE | Approved | The addition and shed was already completed at time of inspection, unable to verify that the framing were done to plan due to being drywalled. Note: Informed homeowner that everything he did without inspection was at his own risk. Also informed homeowner that everything needed to be installed and completed before calling in for final inspections. At that time we would check that all MEP was functioning properly. |
| 07/29/2019 | RESIDENTIAL INTERMEDIATE | AKLEINSORGE | Approved | The addition and shed was already completed at time of inspection, Mechanical, Electrical and Plumbing appears to be done to correctly but drywall was already installed at time of inspection. Note: Informed homeowner that everything he did without inspection was at his own risk. Also informed homeowner that everything needed to be installed and completed before calling in for final inspections. At that time we would check that all MEP was functioning properly. |
| 07/29/2019 | ELECTRIC - UNDERGROUND | AKLEINSORGE | Approved | The shed was already completed at time of inspection, unable to verify the depth of the conduit installed between existing home and shed. Note: Informed homeowner that everything he did without inspection was at his own risk. Also informed homeowner that everything needed to be installed and completed before calling in for final inspections. At that time we would check that all MEP was functioning properly. |
| 08/21/2019 | ELECTRIC - FINAL | MHASSAN | Approved | |
| 09/06/2019 | PLUMBING - FINAL | TVALENCIA | Approved |