Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Closed
Type:
POOL - RESIDENTIAL
Apply Date:
06/03/2019
Applicant:
BONNEMA POOL AND SPAS
Description:
14x30 pool - 6x7 spa heater - 175 ft of 2" gas line - 10ft retainer wall - 80ft of 5ft wall - 20 ft of W/I - auto cover gates
Contractors:
  • BONNEMA COMPANY INC , THE

Permit Reviews

Permit Number - T19BU00288
Permit Status: Closed
Permit Description: 14x30 pool - 6x7 spa heater - 175 ft of 2" gas line - 10ft retainer wall - 80ft of 5ft wall - 20 ft of W/I - auto cover gates
Start Date Submittal Complete Date Status  
06/03/2019 POOL - SPA 06/03/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Closed
Permit Number: T19BU00288
Permite Description: 14x30 pool - 6x7 spa heater - 175 ft of 2" gas line - 10ft retainer wall - 80ft of 5ft wall - 20 ft of W/I - auto cover gates
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
POOL/SPA HEATER N/A Not Inspected
02/21/2020 POOL/SPA FINAL/BARRIER N/A Not ready for Inspection
08/20/2019 POOL/SPA GAS N/A Partial Approval 1- Gas pressure test was provided for underground gas line.
2- Shall provide clean fill rock free for backfilling of gas line.
11/21/2019 REINFORCED MASONRY PRE-GROUT N/A Partial Approval Southeast corner.

Completed Inspections

Permit Status: Closed
Permit Number: T19BU00288
Permit Description: 14x30 pool - 6x7 spa heater - 175 ft of 2" gas line - 10ft retainer wall - 80ft of 5ft wall - 20 ft of W/I - auto cover gates
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/26/2019 POOL/SPA PRE-GUNITE MHASSAN Approved after speaking with pool designer, contractor did meet minimum requirements on freestanding pool footing, although did not build exactly per detail.
07/26/2019 POOL/SPA PRE-GUNITE MHASSAN Approved freestanding wall portion, one detail shows a footing and the other detail does not show a footing please verify which one is correct with the engineer as the current wall footing is not per detail.
07/26/2019 POOL/SPA BONDING GRID MHASSAN Approved
07/26/2019 POOL/SPA ELECTRIC MHASSAN Approved
07/26/2019 POOL/SPA PLUMBING MHASSAN Approved
10/30/2019 STEM WALL/RETAINING WALL ESTEVENS Approved
10/30/2019 EXCAVATION/LAYOUT REBAR & ZON ESTEVENS Approved
03/11/2020 GAS CLEARANCE TVALENCIA Approved
03/11/2020 BUILDING - FINAL TVALENCIA Approved 1- I recommend that the West gate and patio wall be access proof by stepping over the barrier even though an approved cover has been provided.
2- Clear gas meter
Verbal clearance called in at 11:28am

Documents

File Name Document Type  
None CONSTRPLANS VIEW
None DOCUMENTS VIEW