Permit: T18RW05655
Permit Details
Apply Date:
12/21/2018
Applicant:
N/A
Description:
VSP (2019) - ATLAS 0068, 6TH AVE. & IRVINGTON RD - REPLACE 2,457 LF IN CITY RIGHT OF WAY (435 LF VIA TRENCHING/BORING IN PAVEMENT; 2,022 LF VIA TRENCHING/BORING IN DIRT) NOTE: IRVINGTON RD IS UNDER A PAVEMENT MORATORIUM - ANY CUTS IN THE ASPHALT ON IRVINGTON WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUTS FOR ALL AFFECTED TRAVEL LANES NOTE: THE TUCSON RODEO IS FEBRUARY 22, IF THE CONTRACTOR IS NOT DONE WITH THEIR WORK PRIOR TO INITIAL BARRICADE SETUP FOR THE RODEO, CONTRACTOR SHALL REMOVE THEIR BARRICADING, FILL IN ALL HOLES AND MAKE THE AREA SAFE FOR RODEO PARTICIPANTS
Contractors:
- NPL CONSTRUCTION CO
Completed Inspections
Permit Status: Final
Permit Number: T18RW05655
Permit Description: VSP (2019) - ATLAS 0068, 6TH AVE. & IRVINGTON RD - REPLACE 2,457 LF IN CITY RIGHT OF WAY (435 LF VIA TRENCHING/BORING IN PAVEMENT; 2,022 LF VIA TRENCHING/BORING IN DIRT)
NOTE: IRVINGTON RD IS UNDER A PAVEMENT MORATORIUM - ANY CUTS IN THE ASPHALT ON IRVINGTON WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUTS FOR ALL AFFECTED TRAVEL LANES
NOTE: THE TUCSON RODEO IS FEBRUARY 22, IF THE CONTRACTOR IS NOT DONE WITH THEIR WORK PRIOR TO INITIAL BARRICADE SETUP FOR THE RODEO, CONTRACTOR SHALL REMOVE THEIR BARRICADING, FILL IN ALL HOLES AND MAKE THE AREA SAFE FOR RODEO PARTICIPANTS
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2019 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | All main line installed on irvington, no issues because gas line was in dirt area. Numerous patches on 12th with no issues One sidewalk repair completed on 3rd and Irvington. No issues, |