Permit: T18RW05597
Permit Details
Apply Date:
12/19/2018
Applicant:
COX COMMUNICATIONS
Description:
Start Point: From the TEP pole on the East side of 5353 E 5th St begin 542' overlash heading East. Riser down and begin pull; through existing begin pull through existing head North 25' to of of ROW. TRAFFIC CONTROL SET UP SHALL NOT COMMENCE UNTIL AFTER 9:00AM
Contractors:
- BEAR COMMUNICATIONS OF NEW MEXICO INC
- TRUENET COMMUNICATIONS CORP
Completed Inspections
Permit Status: Final
Permit Number: T18RW05597
Permit Description: Start Point: From the TEP pole on the East side of 5353 E 5th St begin 542' overlash heading East. Riser down and begin pull; through existing begin pull through existing head North 25' to of of ROW.
TRAFFIC CONTROL SET UP SHALL NOT COMMENCE UNTIL AFTER 9:00AM
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2019 | TDOT-EXCAV GENERAL INSPECTION | MVV | Approved | Appears completed. |