Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18RW05594
Permit Details
Apply Date:
12/18/2018
Applicant:
COX COMMUNICATIONS**B
Description:
Starting on the S/W corner of the ally West of N Alvernon Way between E. Ryan Rd and E. Edison Pl at TEP pole, overlash going North for 190' , riser down pole place a 3x3x3 pothole and trench / bore 85' East placing a 3x3x3 pothole continue trench/bore East 20' to out of row NOTE: ALVERNON WAY IS UNDER PAVEMENT MORATORIUM - IF CONTRACTOR TRENCHES ACROSS ALVERNON, CONTRACTOR SHALL MILL AND OVERLAY 2" OF ASPHALT, 50' FROM THE OUTSIDE OF THE CUTS FOR ALL AFFECTED TRAVEL LANES
Contractors:
- BEAR COMMUNICATIONS OF NEW MEXICO INC
- TRUENET COMMUNICATIONS CORP
Completed Inspections
Permit Status: Final
Permit Number: T18RW05594
Permit Description: Starting on the S/W corner of the ally West of N Alvernon Way between E. Ryan Rd and E. Edison Pl at TEP pole, overlash going North for 190' , riser down pole place a 3x3x3 pothole and trench / bore 85' East placing a 3x3x3 pothole continue trench/bore East 20' to out of row
NOTE: ALVERNON WAY IS UNDER PAVEMENT MORATORIUM - IF CONTRACTOR TRENCHES ACROSS ALVERNON, CONTRACTOR SHALL MILL AND OVERLAY 2" OF ASPHALT, 50' FROM THE OUTSIDE OF THE CUTS FOR ALL AFFECTED TRAVEL LANES
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/06/2019 | TDOT-Routine Barricade Inspect | MVV | Approved | Appears completed. 1 sidewalk panel missing from years ago, possible TEP work. |