Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
12/17/2018
Applicant:
CENTURYLINK
Description:
N.449297 - This job bores 88' of 4" PVC along SW corner of W Cushing St & S Avenida Del Convento. Access MH #6746 located on NW corner of S Avenida Del Convento & W Cushing St. Access MH #6206 located on SE corner of W Pasea de lost Zanjeros & S Avendia Del Convento. Splicing fibers within. 12/14/2018-SPOKE W/NICHOLAS@ CENTURYLINK - REQUESTD CENTURYLINK TO COORDINATE W/CONTRACTORS WORKING IN AREA TO REDUCE CONFLICTS AND CONFUSING BETWEEN BARRICADE SET UPS. 1/10/19 WORK DESCRIPTION CHANGE: 4X4 PIT REQUIRED TO REPAIR DAMAGED EXISTING CONDUIT

Completed Inspections

Permit Status: Final
Permit Number: T18RW05538
Permit Description: N.449297 - This job bores 88' of 4" PVC along SW corner of W Cushing St & S Avenida Del Convento. Access MH #6746 located on NW corner of S Avenida Del Convento & W Cushing St. Access MH #6206 located on SE corner of W Pasea de lost Zanjeros & S Avendia Del Convento. Splicing fibers within. 12/14/2018-SPOKE W/NICHOLAS@ CENTURYLINK - REQUESTD CENTURYLINK TO COORDINATE W/CONTRACTORS WORKING IN AREA TO REDUCE CONFLICTS AND CONFUSING BETWEEN BARRICADE SET UPS. 1/10/19 WORK DESCRIPTION CHANGE: 4X4 PIT REQUIRED TO REPAIR DAMAGED EXISTING CONDUIT
Total Completed Inspections - 1
Date Description Inspector Results Comments
02/21/2019 TDOT-EXCAV GENERAL INSPECTION Bravin Approved Underground work complete prior to me starting back in Right of way. Tucson asphalt finally repaired cushing with a perm 24.5 x 10 ft patch. 9 in of PAG 11 was used. No isssues with repairs

Documents

File Name Document Type  
T18RW05538.PDF ROW-RIGHT OF WAY VIEW
T18RW05538 R2.PDF ROW-RIGHT OF WAY VIEW
T18RW05538 R3.PDF ROW-RIGHT OF WAY VIEW