Permit: T18RW04327
Permit Details
Apply Date:
09/27/2018
Applicant:
COX COMMUNICATIONS
Description:
Start Point: On the East side of N Campbell Ave and E 4th St , begin 645' overlash heading North. Continue overlash in the alley , 2507' heading East. Riser down, begin 16' trench/bore heading East, placing1x2'' conduit, head 6' south to out of Row . Part 2: Riser down ,22' trench/bore heading east, placing 1-4'' conduit. head 4' trench/bore placing new COX vault A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season. TDOT Engineering may grant an exception for documented emergency work or on-going construction work.
Contractors:
- TRUENET COMMUNICATIONS CORP
Completed Inspections
Permit Status: Final
Permit Number: T18RW04327
Permit Description: Start Point: On the East side of N Campbell Ave and E 4th St , begin 645' overlash heading North. Continue overlash in the alley , 2507' heading East. Riser down, begin 16' trench/bore heading East, placing1x2'' conduit, head 6' south to out of Row . Part 2: Riser down ,22' trench/bore heading east, placing 1-4'' conduit. head 4' trench/bore placing new COX vault
A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season. TDOT Engineering may grant an exception for documented emergency work or on-going construction work.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2018 | TDOT-EXCAV GENERAL INSPECTION | MVV | Approved | Competed.No asphalt or sidewalk affected. |