Permit: T18RW03900
Permit Details
Apply Date:
08/30/2018
Applicant:
N/A
Description:
Installation of new 6" primary electric conduit from existing electrical panels on the West side of Wildcat Laundry North on Tyndall to Speedway and West on Speedway to the alley on the West side of the future HUB III building. All work (saw cutting, pavement removal, potholing, trenching, conduit installation, backfill) will be performed during night shift. Asphalt paving will need to be done during the day, or on a Saturday when the batch plant is open. Night work will be limited to Thursday 9/20/18 through Wednesday 9/26/18 per the TNE. With weather impacts, possible work on Sunday night will be required. Final paving will be scheduled within 10 days of night work (prior to 10/5/18). Note: Existing bus stop on Speedway is already out-of-service. No impacts to SunTran will be realized.
Contractors:
- BEAL DERKENNE CONSTRUCTION LLC***APA***
- EAGLE ROCK EXCAVATING L L C
Outstanding Inspections
Permit Status: Expired
Permit Number: T18RW03900
Permite Description: Installation of new 6" primary electric conduit from existing electrical panels on the West side of Wildcat Laundry North on Tyndall to Speedway and West on Speedway to the alley on the West side of the future HUB III building. All work (saw cutting, pavement removal, potholing, trenching, conduit installation, backfill) will be performed during night shift. Asphalt paving will need to be done during the day, or on a Saturday when the batch plant is open. Night work will be limited to Thursday 9/20/18 through Wednesday 9/26/18 per the TNE. With weather impacts, possible work on Sunday night will be required. Final paving will be scheduled within 10 days of night work (prior to 10/5/18).
Note: Existing bus stop on Speedway is already out-of-service. No impacts to SunTran will be realized.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/28/2018 | TDOT-EXCAV GENERAL INSPECTION | N/A | Continued | During placement of tower crane contractor told not to start barricades till 9 am and must be removed by 3:30 pm. During the placement of tower crane the new asphalt was damaged and needs to be replaced. |