Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18RW03887
Permit Details
Apply Date:
08/30/2018
Applicant:
ADEQ
Description:
COLLECT @ 5-10 FOOT DEEP SOIL-GAS SAMPLES ALONG W ALTURAS ST, N. CASTRO AV., N BALBOA AV., W GRANT RD., W SAHUARO ST., N 9TH AV AND N. 10TH AV. SEE ATTACHED MAP OF PROPOSED SAMPLING LOCATIONS (IN RED) BORINGS WILL BE 1 INCH DIAMETER AND WILL BE BACKFILLED AND PATCHED TO MATCH CURRENT CONDITIONS. WE WILL USE BLUESTAKE TO CLEAR ALL SAMPLING POINTS BEFORE STARTING. ANTICIPATED WORK WILL BE COMPLETED WITHIN ONE (1) WEEK. ADEQ TO PROVIDE TRAFFIC CONTROL PER MUTCD.
Completed Inspections
Permit Status: Final
Permit Number: T18RW03887
Permit Description: COLLECT @ 5-10 FOOT DEEP SOIL-GAS SAMPLES ALONG W ALTURAS ST, N. CASTRO AV., N BALBOA AV., W GRANT RD., W SAHUARO ST., N 9TH AV AND N. 10TH AV. SEE ATTACHED MAP OF PROPOSED SAMPLING LOCATIONS (IN RED) BORINGS WILL BE 1 INCH DIAMETER AND WILL BE BACKFILLED AND PATCHED TO MATCH CURRENT CONDITIONS. WE WILL USE BLUESTAKE TO CLEAR ALL SAMPLING POINTS BEFORE STARTING. ANTICIPATED WORK WILL BE COMPLETED WITHIN ONE (1) WEEK.
ADEQ TO PROVIDE TRAFFIC CONTROL PER MUTCD.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/27/2018 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | Soil sampling. No Issues. |