Permit: T18RW03850
Permit Details
Apply Date:
08/28/2018
Applicant:
MOBILITIE LLC
Description:
Replace City of Tucson Street light Pole with New Pole to match existing City look and design that will allow for Wireless communications. PH90XS126A / 9AZB001066A POLE REMOVAL AND PLACEMENT MUST BE COORDINATED WITH TDOT ELECTRIC SHOP, ERNIE ENCINAS, 837-6801. FIBER & ELECTRIC SERVICE WILL BE PERMITTED SEPARATELY.
Contractors:
- MANGUM CIVIL CONSTRUCTORS INC
Permit Reviews
Permit Number - T18RW03850
Permit Status: Withdrwn
Permit Description: Replace City of Tucson Street light Pole with New Pole to match existing City look and design that will allow for Wireless communications.
PH90XS126A / 9AZB001066A
POLE REMOVAL AND PLACEMENT MUST BE COORDINATED WITH TDOT ELECTRIC SHOP, ERNIE ENCINAS, 837-6801.
FIBER & ELECTRIC SERVICE WILL BE PERMITTED SEPARATELY.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/28/2018 | ROW SWF - SUBMITTAL | 09/10/2018 | COMPLETED |
09/11/2018 | ROW SWF - RE-SUBMITTAL | 09/28/2018 | COMPLETED |
Outstanding Inspections
Permit Status: Withdrwn
Permit Number: T18RW03850
Permite Description: Replace City of Tucson Street light Pole with New Pole to match existing City look and design that will allow for Wireless communications.
PH90XS126A / 9AZB001066A
POLE REMOVAL AND PLACEMENT MUST BE COORDINATED WITH TDOT ELECTRIC SHOP, ERNIE ENCINAS, 837-6801.
FIBER & ELECTRIC SERVICE WILL BE PERMITTED SEPARATELY.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2018 | TDOT-EXCAV GENERAL INSPECTION | N/A | Continued | Pre-con at job site. Discussed contractor calling for inspection on any work that affects roads, sidewalks, etc.. Existing pole is not a light pole and now requires a change order - possible relocation of new pole and keeping existing footing for future use. Possible start in 2 weeks. No work in grant Rd. during holidays. |