Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T18RW03838
Permit Details
Apply Date:
08/27/2018
Applicant:
CANYON BUILDING AND DESIGN
Description:
TRAFFIC CONTROL PERMIT FOR PIA T18PI00003 - SPEEDWAY ONLY (SEPARATE PERMIT WILL BE NEEDED FOR 6TH AV) LIGHT POLE RELOCATION, SIDEWALK MODIFICATIONS, DECELERATION LANE INSTALLATION AND NEW ENTRANCES/EXITS NOTE: SPEEDWAY BL IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. ADDRESS ON APPLICATION: 203 E SPEEDWAY BL 12/26/2018- N. 6TH AV; EXTEND HATCH MARK STRIP TO CURB IN THERMO, MUST BE RESTORED AS BEFORE.
Completed Inspections
Permit Status: Final
Permit Number: T18RW03838
Permit Description: TRAFFIC CONTROL PERMIT FOR PIA T18PI00003 - SPEEDWAY ONLY
(SEPARATE PERMIT WILL BE NEEDED FOR 6TH AV)
LIGHT POLE RELOCATION, SIDEWALK MODIFICATIONS, DECELERATION LANE INSTALLATION AND NEW ENTRANCES/EXITS
NOTE: SPEEDWAY BL IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
ADDRESS ON APPLICATION: 203 E SPEEDWAY BL
12/26/2018- N. 6TH AV; EXTEND HATCH MARK STRIP TO CURB IN THERMO, MUST BE RESTORED AS BEFORE.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/27/2018 | TDOT-Routine Barricade Inspect | JKokot1 | Approved | Permit renewed. Substantially complete but work remains New project Supt. for Canyon Building Jack Komzak |